    The guys doing the work can't get it done without the right guys in the job shack and then the right guys in the Lemoine and Juneau corporate offices. It's a project management thing. Also, this being done with private funds, things get done much easier.

    Unfortunately, the softball stadium is a different thing all together. I still say there is something going on there that does not meet the eye (I'm thinking politics or bureaucracy). I fear Al Lamson is turning over in his grave because he was a "get 'r done" type of person. Granted the final product will be very nice, but there is no reason for the work to take as long as it has.


  2. #142
    Join Date
    May 2002
    Location
    Decatur, AL
    Posts
    1,711

    Default Re: Campus Expansions

    Being out of state, I really love seeing the progress going on. Thanks for the great pictures.


  3. #143
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    2,825

    Default Re: Campus Expansions

    Continued good weather allowed for significant progress since last week. Starting 3rd floor framing of Taft Street Dorm. I stand by my previous prediction of floor framing being finished by mid to late April if weather holds. D H Griffin Demolition equipment moved out on Wednesday 3/22/11. Hauling in dirt for Tulane Avenue Dorm

    march-26


    North End of Taft Street Dorm

    taft-north



    Middle section of Taft Street dorm

    taft-middle

    South end of Taft Street dorm
    taft-south

    Watch your step

    watch-step


    Carpentry Foreman
    foreman

    Lunch Break.

    lunch-break


  4. #144
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    2,825

    Default Re: Campus Expansions

    Parking Garage work as of March 26, 2011. Getting ready for placing concrete for the Credit Union slab and continued work on getting the foundation out of the ground.


    parking-garage


    Credit union slab waiting for concrete.


    credit-union


    Riding concrete trowels. Shame on them for allowing concrete blocks to support the wire mesh Tisk Tisk.

    trowels

    New Chilled water lines to Angelle Hall

    chilled-water


  5. #145
    Join Date
    Nov 2006
    Location
    Lafayette, Louisiana
    Posts
    650

    Default Re: Campus Expansions

    Quote Originally Posted by HelmutVII View Post

    New Chilled water lines to Angelle Hall

    chilled-water _
    What the heck is that for? I noticed they had put two big pipes coming out from the band room last Sunday. Also, I've noticed it's been really hot, like the HVAC system hasn't been running in Angelle, when I go to our meetings Sundays. Could it be something to do with that?

  6. #146
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    2,825

    Default Re: Campus Expansions

    Quote Originally Posted by Cajunbander View Post
    _ What the heck is that for? I noticed they had put two big pipes coming out from the band room last Sunday. Also, I've noticed it's been really hot, like the HVAC system hasn't been running in Angelle, when I go to our meetings Sundays. Could it be something to do with that? _
    Yes it's for Ac.

  7. #147
    Join Date
    Nov 2006
    Location
    Lafayette, Louisiana
    Posts
    650

    Default Re: Campus Expansions

    Quote Originally Posted by HelmutVII View Post
    _ Yes it's for Ac. _
    Cool. Hopefully they'll have the building cool tonight.

  8. #148
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    2,825

    Default Re: Campus Expansions

    Photo of January 2, 2011

    demo-1


    Photo of April 2, 2011 just three months later

    April2-2011

    Denbo and Bancroft gone with framing in progress on the fourth and final level of Taft Street Dorm




    Photo of January 2, 2011

    demo3


    Photo of April 2, 2011. Left to right. More foundation work, limestone foundation for first level of parking garage and removing old chilled water line to Angelle Hall.

    parking-garage-april2-2011


  9. #149
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    2,825

    Default Re: Campus Expansions

    North end of Taft Street dorm


    taft-north

    Middle section of Taft Street dorm

    taft-middle


    South End of Taft Street Dorm,

    taft-south


    I still think they will be finished with the framing of the fourth level by the middle of this month (April), if the weather holds. Then the roof trusses go on and the roof deck by mid to late May. Then they will be out of the weather. Right now there is plenty of mechanical and electrical rough in going on on the first two levels.

    They have started with the Geo Pile foundation on the Tulane Ave. Dorm. So it looks like it is about eight weeks behind Taft.


    Completing insulation of the New chilled water line to Angelle Hall.

    angelle-chilled water


  10. #150
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    2,825

    Default Re: Campus Expansions

    Parking Garage Foundation really close to Angelle Hall (the brick wall to the left)

    parking-foundation


    Cutting rebar with a Demo Saw.

    cutting-rebar


    Grading out the Limestone foundation for the first level of the parking garage.

    grading-base

    Once they "get out of the ground" this should progress pretty fast. They really need the parking.


  11. #151
    Join Date
    Jan 2002
    Location
    Louisiana A
    Posts
    17,966
    Blog Entries
    2

    Default Re: Campus Expansions

    Amazing.

    Thank you so much HelmutVII


  12. #152
    Join Date
    Apr 2006
    Location
    Lafayette, LA
    Posts
    4,221

    Default Re: Campus Expansions

    this pace is incredible


  13. #153
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    2,825

    Default Re: Campus Expansions

    Quote Originally Posted by ulforlife View Post
    _ this pace is incredible _

    The pace better be incredible because Taft Street Dorm is scheduled to be open for the Fall Semester. It will be tight, but if they keep it up, they may make it.

  14. #154
    Zeebart21's Avatar
    Zeebart21 is offline Ragin Cajuns of Louisiana Ragin' Cajuns Greatest Fan Ever
    Join Date
    May 2002
    Location
    Lafayette, La.
    Posts
    17,652

    Default Re: Campus Expansions

    Quote Originally Posted by HelmutVII View Post
    _ The pace better be incredible because Taft Street Dorm is scheduled to be open for the Fall Semester. It will be tight, but if they keep it up, they may make it. _
    Helmut, great info. We really appreciate your insight into this construction "stuff!"

    Z

  15. #155
    Hammer58's Avatar
    Hammer58 is offline Ragin Cajuns of Louisiana Ragin' Cajuns Greatest Fan Ever
    Join Date
    Nov 2002
    Location
    Tony Matto. Youngsville, LA
    Posts
    10,597

    Default Re: Campus Expansions

    Sure seem to be making better progress than the guys "working" on the softball stadium.


  16. #156
    Join Date
    Jan 2003
    Posts
    332

    Default Re: Campus Expansions

    Quote Originally Posted by HelmutVII View Post
    ...Then the roof trusses go on and the roof deck by mid to late May. Then they will be out of the weather.
    One day after you posted that, roof framing has begun. Amazing.


  17. #157
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    2,825

    Default Re: Campus Expansions

    Quote Originally Posted by ljr3721 View Post
    _ One day after you posted that, roof framing has begun. Amazing.

    _
    I see all of the diagonal bracing on the second to fourth levels. I hope they have enough, especially on the fourth level. They are predicting the potential for severe weather Monday evening into Tuesday morning. This is a particularly vulnerable time for the structure.

  18. #158
    Join Date
    Nov 2006
    Location
    Lafayette, Louisiana
    Posts
    650

    Default Re: Campus Expansions

    Does anyone know if they're going to have a pathway through the parking tower to the little alcove in Angelle Hall? I know there's no loading zone around Angelle now, and it's a pain in the ___ to have to load or unload stuff. They couldn't make one by the current parking garage, because as it is now, the band field goes from the band tower right up to the sidewalk.


  19. #159
    Join Date
    Jan 2003
    Location
    Abbeville, LA
    Posts
    2,414

    Default Re: Campus Expansions

    Quote Originally Posted by Cajunbander View Post
    _ Does anyone know if they're going to have a pathway through the parking tower to the little alcove in Angelle Hall? I know there's no loading zone around Angelle now, and it's a pain in the ___ to have to load or unload stuff. They couldn't make one by the current parking garage, because as it is now, the band field goes from the band tower right up to the sidewalk. _
    Sounds like decision time: give up the back half of backfield to create a loading/unloading drive straight from Taft to Angelle? Or does the band want to keep the back sideline intact for getting on/off the field? Stay tuned tomorrow to find out...same Bat Time, same Bat Channel!

  20. #160
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    2,825

    Default Re: Campus Expansions

    Quote Originally Posted by Cajunbander View Post
    _ Does anyone know if they're going to have a pathway through the parking tower to the little alcove in Angelle Hall? I know there's no loading zone around Angelle now, and it's a pain in the ___ to have to load or unload stuff. They couldn't make one by the current parking garage, because as it is now, the band field goes from the band tower right up to the sidewalk. _
    It looks like they will have all the roof trusses on and the entire exterior sheeting done by the end of the week. They will be out of the weather and really be able to go to town on the inside work.

    It looks like there will be access to the rear of Angelle Hall through the parking garage. I'm sure the Fire Marshall had something to say about that. It will probably be in combination with the drive through for the credit union. Lets hope there in not a fire in Angelle hall during this construction.

Page 8 of 37 FirstFirst ... 4 5 6 7 8 9 10 11 12 18 ... LastLast

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •