Thread: Campus Construction

  1. #121
    Join Date
    Nov 2006
    Location
    Lafayette, Louisiana
    Posts
    650

    Default Re: Campus Expansions

    Some pictures from 3/2/11

    dorms

    Looks like they're done with the CMU (Fancy construction term I picked up from here.) stairwells and elevator shaft except for one.



    parking garage

    Coming right along on the parking garage.



    foundation

    Looks like they're starting to work on the parking tower's foundation.



    first floor

    Almost done framing the first floor.



    ironworks

    They put up iron framing, I'm guessing this is because it'll be all open since it's the entryway? I dunno.



    Polarized craneflag

    This is just a really cool picture I took while I was up on the parking tower.


  2. #122
    Join Date
    Jan 2002
    Location
    Louisiana A
    Posts
    16,659
    Blog Entries
    2

    Default Re: Campus Expansions

    Quote Originally Posted by Cajunbander View Post
    Looks like they're done with the CMU (Fancy construction term I picked up from here.) stairwells and elevator shaft except for one.
    These guys can work.

    Softball got the shaft . . . the other one

  3. #123
    Join Date
    Sep 2006
    Posts
    2,502

    Default Re: Campus Expansions

    Quote Originally Posted by HelmutVII View Post
    _ Thanks, I was wondering if there was any interest and if I should continue to update.

    I think there is a survey control point in the area of the band platform that they do not want to disturb. _
    Thanks to all who provide updates and pics, it's great to be able to watch the progress!

  4. #124
    Boomer's Avatar
    Boomer is offline Ragin Cajuns of Louisiana Ragin' Cajuns Greatest Fan Ever
    Join Date
    Jun 2002
    Posts
    18,445

    Default Re: Campus Expansions

    Quote Originally Posted by ULGrad@HOU View Post
    _ Thanks to all who provide updates and pics, it's great to be able to watch the progress! _
    Obviously this picture not taken during 12 o'clock lunch break

    -Nobody under the Pride of Should be Louisiana stand!!! LOL


  5. #125
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    2,703

    Default Re: Campus Expansions

    I was thinking that this weeks work would show dramatic difference from last week. It looks like they will be able to go up about one story in two weeks. That means by April they should be close to topping out the wall framing. I suspect they will use prefabricated wood or metal roof trusses which should go up fairly quickly.

    The steel around the elevator shaft is not only for the first floor open spaces but the design loads for the corridors on the second floor and above are much higher than the design loads in the rooms. I also suspect that this is the only steel framing they will need as the floor plan for the second to forth floors will be different. (less open space)

    The foundation that I can see for the parking garage appears to be pretty stout. You can tell by the large pile of excavated dirt near where the old credit union building was. Just about every cubic yard of material excavated will be replaced with concrete. I also saw some substantial rebar mats stockpiled on the site. Looks like plenty of rod busting going to take place there. Once they get "out of the ground", the parking garage will go pretty fast because each level will be repetitive. Finish work on the garage will be mostly perimeter cosmetics as the interior will be "plain Jane" the only thing needed is lighting and life safety related mechanicals.

    They are scheduled to open the Taft Street dorm in AUGUST of THIS YEAR. I'm thinking it will be close, but if they can keep up this work progress they could very well make it. If they miss the deadline, it won't be by much. I spoke to the band director one evening on my walk and he said they were going to give him a sodded and watered practice field in August. An ambitious schedule indeed. I estimate they have accomplished easily 1.5 million dollars worth of work since the first of the year.


  6. #126
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    2,703

    Default Re: Campus Expansions

    Quote Originally Posted by Boomer View Post
    _ Obviously this picture not taken during 12 o'clock lunch break

    -Nobody under the Pride of Should be Louisiana stand!!! LOL _

    They do not take lunch breaks all at one time. They break in shifts and eat on their tailgates. There is a constant work going on at the site from "can to can't" and sometimes beyond. Equipment maintenance takes place at night, if necessary, under light towers. I'm hoping the foundation crew for the parking garage finishes in time for them to move onto one of my projects scheduled for auger cast piling. I want these guys on my project!!!

  7. #127
    Boomer's Avatar
    Boomer is offline Ragin Cajuns of Louisiana Ragin' Cajuns Greatest Fan Ever
    Join Date
    Jun 2002
    Posts
    18,445

    Default Re: Campus Expansions

    Quote Originally Posted by HelmutVII View Post
    _ They do not take lunch breaks all at one time. They break in shifts and eat on their tailgates. There is a constant work going on at the site from "can to can't" and sometimes beyond. Equipment maintenance takes place at night, if necessary, under light towers. I'm hoping the foundation crew for the parking garage finishes in time for them to move onto one of my projects scheduled for auger cast piling. I want these guys on my project!!! _
    Are there union guys???? I don't think that is the case!!! Does anyone know for sure????

  8. #128
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    2,703

    Default Re: Campus Expansions

    Quote Originally Posted by Boomer View Post
    _ Are there union guys???? I don't think that is the case!!! Does anyone know for sure???? _
    I don't know if they are Union workers. I do know that ALL workers wear the proper safety gear, they ALL wear the yellow work vests. The work site is tightly regulated in that if you do not have the proper apparel you will stand out immediately. I am sure there is a safety guy or project superintendent on the site that will run your _____ off if he sees somebody without the proper safety gear. The only ones that do not have the proper safety gear are truck drivers that deliver materials and they are on the site and off pretty quick. Most of the time they do not get out of their truck.

    I do know, from the little bit of observation that I can see on the weekends, there is not much standing around on the job site.

  9. #129
    Join Date
    Nov 2006
    Location
    Lafayette, Louisiana
    Posts
    650

    Default Re: Campus Expansions

    Quote Originally Posted by HelmutVII View Post
    I do know, from the little bit of observation that I can see on the weekends, there is not much standing around on the job site. _
    THEY NEVAR STOP!!!!!!!!

    Seriously though, passing back and forth throughout the week, nobody is ever just standing there, they all look like they have a job to do at any one point in time. The parking tower is working out well for the crews I constantly see people running up there with plans? and surveying the worksite.

  10. #130
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    2,703

    Default Re: Campus Expansions

    I saw some light towers placed near the McKinley street end of the parking garage last night on my walk. I figured they would be placing concrete for the Parking garage foundation early this morning. I woke up at a bout 3:00 A.M. this morning and heard a fairly steady stream of concrete trucks on University Ave. So I guess they did place some of the foundation this morning. Good thing as we are expecting rain this afternoon into tomorrow.


  11. #131
    Join Date
    Nov 2006
    Location
    Lafayette, Louisiana
    Posts
    650

    Default Re: Campus Expansions

    Quote Originally Posted by HelmutVII View Post
    _ I saw some light towers placed near the McKinley street end of the parking garage last night on my walk. I figured they would be placing concrete for the Parking garage foundation early this morning. I woke up at a bout 3:00 A.M. this morning and heard a fairly steady stream of concrete trucks on University Ave. So I guess they did place some of the foundation this morning. Good thing as we are expecting rain this afternoon into tomorrow. _
    My friend lives in the house directly across Taft from the field, and he says that they're out most nights doing something.

  12. #132
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    2,703

    Default Re: Campus Expansions

    An amazing day today. No work being done after 2" of rain yesterday.

    An overview of work as of March 6, 2011

    march-6

    North end of Taft Street dorm showing second floor decking.


    framing1

    Middle section of Taft Street dorm with Denbo debris pile in background.

    framing2

    South end of Taft Street dorm almost ready for decking.

    framing-3

    The size of the building is starting to show now. If you can imagine this amount of framing 3 more times you can get the idea. Kind of hard to show in photographs though.



    Bancroft slab and foundation below is all that remains

    bancroft-slab



    Parking garage work site after 2" of rain on March 5, 2011. It will be a mess tomorrow when they continue working.

    parking-garage


    A portion of the foundation placed on Friday morning March 4, 2011

    parking-foundation


  13. #133
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    2,703

    Default Re: Campus Expansions

    Work being done on March 12, 2011

    Clockwise from left. Second floor framing, Bancroft foundation demolition


    mar-12-2011

    Second floor framing of North end of Taft Street Dorm. Yellow rods at the top of the stud walls are for OSHA required railings needed when decking the third floor.

    taft-north

    Middle section of Taft Street Dorm.

    taft-middle

    Second floor of South end of Taft Street Dorm getting decked.
    taft-south

    Breaking up Denbo Foundation

    concrete-breaker

    Debris pile of Bancroft foundation, looks like they are removing everything down to about 4 or 5 feet below ground level. The round pieces of concrete are the tops of the piling for Bancroft. The materials in foreground are truss joists for the second floor ceiling of the Taft Street Dorm.

    truss-joists


  14. #134
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    2,703

    Default Re: Campus Expansions

    Parking garage work on March 12, 2011

    Rod busting to the right, foundation excavation in the middle and concrete placement to the left.

    p-garage-mar-12-2011

    Rod Busting for the Parking garage foundation

    rod-busting

    Excavation for the Parking garage foundation

    foundation-excavation

    Placing concrete for the Parking garage foundation
    placing-concrete


  15. #135
    Join Date
    Nov 2006
    Location
    Lafayette, Louisiana
    Posts
    650

    Default Re: Campus Expansions

    I was taking pictures of the site yesterday as well. I ran into one of the crew at the top of the stairs and he was saying they've been coming in and taking aerial shots of the site on a regular basis. I didn't think to ask him if they were or would be posting them somewhere online. It'd be cool to see.


  16. #136
    Join Date
    Jan 2002
    Location
    Louisiana A
    Posts
    16,659
    Blog Entries
    2

    Default Re: Campus Expansions

    Thanks for all the updates.

    Very fun to see.
    igeaux.mobi


  17. #137
    DaddyCajun's Avatar
    DaddyCajun is offline Dig deep UL will Prosper! Ragin' Cajuns Greatest Fan Ever
    Join Date
    Aug 2002
    Location
    Da Cro
    Posts
    5,526

    UL Softball Re: Campus Expansions

    Quote Originally Posted by Turbine View Post
    _ These guys can work.

    Softball got the shaft . . . the other one _
    The First Softball crew issued the Shaft .........the crew they have now has been doing great!!!

  18. #138
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    2,703

    Default Re: Campus Expansions

    Overview of work as of March 19, 2011 More framing on Taft Street Dorm, final debris removal of Denbo and site prep for Tulane Ave Dorm (8912)

    overview-3-19-11


    North end of Taft Dorm, 3rd floor decking should start soon.
    taft-north


    Middle section of Taft Street Dorm
    Taft-middle


    South End of Taft Street Dorm
    Taft-south


    D. H. Griffin Demolition equipment running out of things to do.
    d-h-griffin


    Last pile of debris from Denbo demolition
    last-debris


    Wind rowing soil to dry it out. Starting to do site prep on the north end of Tulane Ave. Dorm.
    wind-row


  19. #139
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    2,703

    Default Re: Campus Expansions

    Parking garage work as of March 19, 2011

    Major foundation work is just about complete,

    parking-garage


    First level parking pad. Stacks of insulated pipe are for chilled water for AC to credit union (I guess).
    1st-floor-parking


    New Credit Union location
    new-credit-union


    Layout lines for foundation walls in Parking garage.

    layout


  20. #140
    Zeebart21's Avatar
    Zeebart21 is offline Ragin Cajuns of Louisiana Ragin' Cajuns Greatest Fan Ever
    Join Date
    May 2002
    Location
    Lafayette, La.
    Posts
    17,596

    Default Re: Campus Expansions

    That is awesome progress. Can we maybe send just 2 of those guys to finish the softball field??

    Z


Page 7 of 36 FirstFirst ... 3 4 5 6 7 8 9 10 11 17 ... LastLast

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •