    _ Lemoine is putting together a good plan and executing it well _
    Yes they are. They also have good subs. I noticed last week that they had about 30% to 40% of the area for Dorm No. 1 covered with visqueen so it would not get too wet during the rains. If a path is muddy, they use some of the broken concrete from Bancroft to make a road. The concrete pumper truck was on a pad of broken concrete from Bancroft. If they can do something to make things progress they will do it.

    This is polar opposite to the contractor building the new softball complex. That guy is a joke!!! Being happy with that contractor would be the same thing as being happy with the caterer delivering food for your daughters wedding one month late, and still having to pay for it.

  2. #42
    Zeebart21's Avatar
    Zeebart21 is offline Ragin Cajuns of Louisiana Ragin' Cajuns Greatest Fan Ever
    Join Date
    May 2002
    Location
    Lafayette, La.
    Posts
    17,653

    Default Re: Campus Expansions

    Quote Originally Posted by HelmutVII View Post
    _ Yes they are. They also have good subs. I noticed last week that they had about 30% to 40% of the area for Dorm No. 1 covered with visqueen so it would not get too wet during the rains. If a path is muddy, they use some of the broken concrete from Bancroft to make a road. The concrete pumper truck was on a pad of broken concrete from Bancroft. If they can do something to make things progress they will do it.

    This is polar opposite to the contractor building the new softball complex. That guy is a joke!!! Being happy with that contractor would be the same thing as being happy with the caterer delivering food for your daughters wedding one month late, and still having to pay for it. _

  3. #43
    Join Date
    Nov 2006
    Location
    Lafayette, Louisiana
    Posts
    650

    Default Re: Campus Expansions

    I dunno about working at night. There's a lot of residential around the site. I know that a lot of lighting got taken out when they demo'ed the Credit Union. I'm around Anglle a lot, between band (not really anymore) and my fraternity (we meet in Angelle Hall on Sunday nights). There are ALWAYS students around Angelle Hall. Everyone in the music dept has card access to the building 24/7, so there's always students practicing and I have a bunch of friends who, since the internet in the dorms suck, go to Angelle to get online. Last week, with no lights back there, it was extremely dark. I noticed earlier that they had lights installed on the corner of Angelle. The lights might simply be for safety reasons. (Also, the cameras they installed around the building might be worthless without lighting.)

    Also, while getting sources for a section on UL's Wikipedia entry for the campus expansions, I found a webcam set up overlooking the work site. It's on UL's housing website:

    http://housing.louisiana.edu/residence/taft-hall.shtml


  4. #44
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    2,825

    Default Re: Campus Expansions

    Quote Originally Posted by Cajunbander View Post
    _ I dunno about working at night. There's a lot of residential around the site. I know that a lot of lighting got taken out when they demo'ed the Credit Union.

    Also, while getting sources for a section on UL's Wikipedia entry for the campus expansions, I found a webcam set up overlooking the work site. It's on UL's housing website:

    http://housing.louisiana.edu/residence/taft-hall.shtml _
    Lack of lighting is why they brought in some light towers.

    I noticed the camera too, I figured they would have a web cam.

  5. #45
    Join Date
    Nov 2006
    Location
    Lafayette, Louisiana
    Posts
    650

    Default Re: Campus Expansions

    I betcha one could get a really good deal on these "slightly" used mattresses!

    1-31-11


  6. #46
    Join Date
    Jan 2003
    Location
    Abbeville, LA
    Posts
    2,414

    Default Re: Campus Expansions

    Quote Originally Posted by Cajunbander View Post
    _ I betcha one could get a really good deal on these "slightly" used mattresses!

    1-31-11 _
    We call them "gently used" in the mattress game.

  7. #47
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    2,825

    Default Re: Campus Expansions

    The foundation crew for the parking garage started to move equipment in today. Looks like they will use Berkel pressure grouted piles. It ought to be interesting to see.


  8. #48
    Join Date
    Nov 2006
    Location
    Lafayette, Louisiana
    Posts
    650

    Default Re: Campus Expansions

    I don't know about Berkel ground piles or anything like that, all I know is that they moved in a big ole crane this afternoon. I's assume they're about to start driving some foundation piles in.


  9. #49
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    2,825

    Default Re: Campus Expansions

    Lots and lots of work today, February 6, 2011. They had the light towers on last night and were working on Dorm No. 1 foundation.

    Clock wise from left, Auger for auger cast piles, Foundation pad for Dorm No. 1 almost ready for rebar, Dust suppressor, Bancroft demolition, more plumbing and foundation work for dorm no. 1, and in the middle on the bottom, carpenters preparing form work.


    feb-6-work

    Dust suppressor, If it's not raining they use this to help with the dust, Yesterday there was a dust cloud over University Ave almost all afternoon.

    dust-suppresor

    Rebar recycling, almost all the metal, concrete and brick will be recycled. This is where much of the profit is in demolition.

    rebar-recycle

    BFDBH at work, if they had more room to work, these two buildings would have been demolished in a little over a week. Once they get Bancroft down then they will have much more room to work.

    bfdbh-1


    BFDBH getting ready to take another row of columns down.

    bfdbh-2

    BFDBH finished taking out columns, It took about 10 minutes from the previous photo. Right after I took this photo he pulled the columns out below.

    bfdbh-3

    Test pile for the Auger Cast piling for the Parking garage.

    test-pile


  10. #50
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    2,825

    Default Re: Campus Expansions

    More photos from Feb 6, 2011

    Dorm No. 1 foundation pad almost ready for rebar. They might be ready to place concrete before the end of the week.

    dorm-1-foundation

    Dorm No 1 elevator pit.

    dorm1-elevator-pit


    A project I worked on last summer. The home team (TCH) will be on the left side and visitors will be looking into the sun on the right side. This is the new Google Earth imagery that is available if you update.

    teurlings


  11. #51
    Join Date
    Nov 2004
    Location
    In da cove :)
    Posts
    208

    Ragin' Cajuns Re: Campus Expansions

    Helmut, thanks for the pics and info. Should be very nice when it's done, and much needed!! Just curious, where is the band going to practice? We did the surveying for the new student union and had to set up a couple tripods on the band practice field (beacuse of control points) and the band director wasn't to happy about it. From looking at the pics, there is no more practice field. Guess he still isn't too happy!


    GEAUX CAJUNS!!!


  12. #52
    Join Date
    Jan 2002
    Location
    Louisiana A
    Posts
    18,012
    Blog Entries
    2

    Default Re: Campus Expansions

    Wow Helmut, that is amazing.

    Thanks.


  13. #53
    Join Date
    Jan 2011
    Location
    United States
    Posts
    81

    UL Baseball Re: Campus Expansions

    What is the estimated time of completion for the first dorm and parking garage?


  14. #54
    Join Date
    Oct 2002
    Posts
    4,670

    Default Re: Campus Expansions

    Quote Originally Posted by HelmutVII View Post
    A project I worked on last summer. The home team (TCH) will be on the left side and visitors will be looking into the sun on the right side. This is the new Google Earth imagery that is available if you update.

    teurlings _
    I LOVE this picture!!!

  15. #55
    Join Date
    Aug 2003
    Location
    Youngsville, LA
    Posts
    3,905

    Default Re: Campus Expansions

    Quote Originally Posted by RayneCajun View Post
    _ Helmut, thanks for the pics and info. Should be very nice when it's done, and much needed!! Just curious, where is the band going to practice? We did the surveying for the new student union and had to set up a couple tripods on the band practice field (beacuse of control points) and the band director wasn't to happy about it. From looking at the pics, there is no more practice field. Guess he still isn't too happy!


    GEAUX CAJUNS!!! _
    It is my understanding that the band practice field is to remain. It will probably be the only real open area in that whole block after the construction is completed.

  16. #56
    CajunAmos's Avatar
    CajunAmos is offline Ragin Cajuns of Louisiana Ragin' Cajuns Greatest Fan Ever
    Join Date
    Jan 2003
    Location
    Lafayette
    Posts
    5,679

    Default Re: Campus Expansions

    I did a little looking on Google Earth also. Looks like a couple of months ago or so based on the Lamson construction.

    Attached Images Attached Images      

  17. #57
    Boomer's Avatar
    Boomer is offline Ragin Cajuns of Louisiana Ragin' Cajuns Greatest Fan Ever
    Join Date
    Jun 2002
    Posts
    18,693

    Default Re: Campus Expansions

    Quote Originally Posted by cajunator View Post
    _ What is the estimated time of completion for the first dorm and parking garage? _
    Before the softball stadium is complete!!!!

    ---Well I hope not!!!! lol


  18. #58
    Join Date
    Jan 2002
    Location
    Louisiana A
    Posts
    18,012
    Blog Entries
    2

    Default Re: Campus Expansions

    I like.

    How nice would a red roof over the IPF look right now? Which reminds me. . .

    The #1 item I have seen recently that shows a new passion at UL -for UL- is the new Vermilion and White entrances to Girard Hall.


  19. #59
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    2,825

    Default Re: Campus Expansions

    Quote Originally Posted by cajunator View Post
    _ What is the estimated time of completion for the first dorm and parking garage? _
    Dorm No. 1 (Taft Street Dorm in the link) is supposed to be open for the fall 2011 semester (that's right) See this link.

    http://housing.louisiana.edu/residence/taft-hall.shtml

    If anybody can do it, Lemoine can. I don't think the parking garage will be ready for the fall. Although, once they get out of the ground it should go pretty fast.


    Harris Hall and Randolph Hall are the only other Dorms scheduled to be open for the fall semester. Bonin, Baker-Huger and Evangeline are scheduled to be closed "for renovation" (demolition).

  20. #60
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    2,825

    Default Re: Campus Expansions

    Quote Originally Posted by CajunAmos View Post
    _ I did a little looking on Google Earth also. Looks like a couple of months ago or so based on the Lamson construction. _

    The imagery was taken in October. If you notice on the Teurlings image I posted, there are no stripes in the curves on the track. and there was construction equipment near the north west corner of the track. The Teurlings track surface is not Polyurethane on Asphalt is is a 3/4" pile turf with a rubber sand infill. The turf for the straights on the track comes from the factory with stripes. The turf for the curves is solid. They shave out the pile and glue in the stripes. They had not put in the curve stripes until later in October. BTW, it feels very good under foot.

Page 3 of 37 FirstFirst 1 2 3 4 5 6 7 13 ... LastLast