    Building 2 has had some dramatic progress this week. It has almost all of the roof sheeted with plywood and the plywood is almost completed felted. Exterior brick and interior work continues on building 1.

    Building 1 as seen from University Ave and Hebrard Blvd Intersection. This wall got bricked this past week. They are leaving the scaffolding up so the trim carpenters can install the roof trim.

    building1-1

    Building 1 as seen from the front steps of the Saucier clinic. This wall had no brick last week.

    building1-2

    Building 1 as seen from the Student Union Service Drive. Buchanan Hall is to the rear left,

    building1-3


    Building 1 as seen from East University. The opening on the first floor is a door. This door is about where the entrance to old Baker-Huger Hall was. Imagine old Baker-Huger stacked on top of each other with another wing almost as big (if not bigger) to the rear of it. These buildings are big.

    building1-4

    View of alley between the two new buildings as seen from East University Ave. The Student Union and Wharton Hall can be seen to the far rear of the middle of the photo.

    1and2-2

    View of the alley between the two new buildings as seen from the Student Union Service drive. (Looking the opposite direction of the photo above). University Ave. is to the rear of the photo.

    1and2-1


    Windowless Randolph Hall

    randolph

    Building 2 as seen from the Student Union Service drive. Harris Hall is to the extreme right.

    building2-1

    Building 2 as seen from the side of McLauren Gym (Student Union is to the rear of the camera). Harris Hall is to the right.

    building2-2

    Building 2 as seen from the sidewalk in front of McLauren Gym. Harris hall is to the right. Building 1 is to the rear.

    building2-3

    Putting the felts on the roof of building 1. Harris Hall is to the left. As seen from the east fire escape of Harris Hall. They are continuing to make progress on the interior renovation of Harris Hall. A very nice sturdy old building.

    building2-harris

    Building 2 as seen from the McKinley University Ave intersection. McKinley is to the rear of the camera and University Ave is to the right.

    building2-4

    Manlift sunk to its axles. They must have believed the salesman. They will have a time getting out on Monday as it is raining right now and probably will continue through most of the night. It might be there a while.

    atv-not


  2. #482
    Boomer's Avatar
    Boomer is offline Ragin Cajuns of Louisiana Ragin' Cajuns Greatest Fan Ever
    Join Date
    Jun 2002
    Posts
    18,592

    Default Re: Campus Construction

    Can anybody put on here the sketching of the Village and the student union---I hope that none of the restaurants or signage has zero tacky look to it!!!!


  3. #483
    Join Date
    Oct 2011
    Location
    Lafayette, LA
    Posts
    1,048

    Default Re: Campus Construction

    Quote Originally Posted by Boomer View Post
    Can anybody put on here the sketching of the Village and the student union---I hope that none of the restaurants or signage has zero tacky look to it!!!!
    Is this what you're looking for?

    http://ullafayettemasterplan.wordpress.com/master-plan/

  4. #484
    Boomer's Avatar
    Boomer is offline Ragin Cajuns of Louisiana Ragin' Cajuns Greatest Fan Ever
    Join Date
    Jun 2002
    Posts
    18,592

    Default Re: Campus Construction

    Not quite

    I had heard that from the old rose garden to the union there would be restaurants and coffee shops and little stores and a walk/path way effect which would accommodate all the dorm and neighborhood students for lite meals and snacks, drug store items and small grocery needs

    I just fell in love with the concept!!!


  5. #485
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    2,813

    Default Re: Campus Construction

    We lucked out and got only a little over 2 inches of rain on Monday March 12 (as opposed to the 15 plus inches that Carencro got) so they were able to get almost a full week of work in. They shut down at 3:00 P.M. on Sunday and found myself locked out.

    This is building 1 from the University Ave Hebrard Blvd intersection. The Oak trees are getting new leaves and they are not as thick as usual.

    Building1-1

    Building 1 from the Saucier clinic front steps. the brick work is completed here. I guess another week or two and the brick work on this building will be finished.

    Building1-2

    Building 1 from the Student Union service drive.

    building1-4

    Basket weave brick work over University Ave entrance to building 1

    building1-5

    Alley between the two new buildings from the Student Union Service drive. University Ave is to the rear of the photo.

    building1-3

    Alley between the two new buildings as seen from University Ave. Student Union and Wharton Hall are to the rear of the photo.

    alley-2

    Building 2 from the Student Union service drive. It looks like the roof is finished on this building. There will be no more roof work on this project.

    building2-1

    Building 2 from the rear of the Student Union. The view from the Harris Hall fire escape is not too good any more, the building is too close.

    building2-2

    Building 2 as seen from the sidewalk in front of McLauren Gym.

    building2-3

    Building 2 from the University Ave McKinley street intersection. Getting ready for brick.

    building2-4

    Gutted Randolph Hall

    randolph-1

    Screw anchors. I haven't figured out what these will be used for.

    screw-anchors


  6. #486
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    2,813

    Default Re: Campus Construction

    No photos this week. They are getting to the point of have more inside work than outside work so the visible progress was not that dramatic this week. A couple of days of rain kind of put the damper on things.


  7. #487
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    2,813

    Default Re: Campus Construction

    Less rain this past week allowed for more outside work to be done.

    The usual starting point. University Ave facade of building 1 from Hebrard Blvd intersection. They started cleaning bricks at this corner and were working to McKinley street. the only exterior work left to do is caulking and a little painting.

    rose-1

    Building 1 from the steps of old Saucier clinic. They cut some trees down along Boucher so you can see the buildings better this week. Ironic that the trees were cut down the week the Arbor Day foundation placed the University on the "Tree Campus USA" list. Trees removed would have been to the left and right of this photograph.

    rose-2

    Alley way between the two new buildings as seen from the Student Union Service drive. Removed trees on left and right of drive allowed for a better view this week.

    rose-4

    Building 1 as seen from the front lawn of McLauren Gym. Again, a better view without the trees. Buchanan Hall is to the rear.

    rose-5


    Building 2 as seen from the front steps of Saucier Clinic. This is a view not seen before because of removed trees.

    rose-3


    University Ave facade of building 2 as seen from McKinley Street intersection.

    rose-6

    Building 1 alley facade as seen from University Ave

    rose-7


    Building 2 alley facade as seen from University Ave .

    rose-10

    University Ave facade of Building 1. The middle of the photo is the old drive to the front of old Bake-Huger. The door to building 1 is about where the entrance to old Baker-Huger was. The brick on this part of the building has been cleaned. This is pretty close to what the finished building will look like (plus landscaping of course)

    rose-9

    Cleaned brick on the right and soon to be cleaned brick on the left. The guy with the hard hat in the lower left is getting ready to go up in the man lift to start cleaning after a break for lunch.

    rose-8

    Randolph Hall. You can't see it but the upstairs is starting to get the partition walls installed.

    Randolph-1


    Windowless Harris Hall. They were working on the fire sprinkler system today. I guess you can see where they got the inspiration for the main entrance facade for the new residence halls.

    Harris-1

    I have always loved the architecture of Randolph and Harris halls. More so Harris as it looks like a classic college residence hall look.

    This is the view from the driveway to my home. You can just see the window holes in Randolph Hall through the lower branches of the oak tree to the left. The oak tress hide the huge new building behind. I am curious to see how the area changes when they occupy the buildings.

    rose-11


  8. #488
    Join Date
    Jan 2002
    Location
    Louisiana A
    Posts
    17,473
    Blog Entries
    2

    Default Re: Campus Construction

    I love that the new residence halls are taking their cue from Harris Hall.


  9. #489
    Join Date
    Jun 2006
    Location
    Lafayette, LA
    Posts
    577

    Default Re: Campus Construction

    Quote Originally Posted by Turbine View Post
    I love that the new residence halls are taking their cue from Harris Hall.
    Recruiting in the academic world is about to get really fun. I pity the fool trying to get kids to go elsewhere. And when the Student Union is done.... And when Adjunct pay gets raised. OK, I got carried away.

  10. #490
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    2,813

    Default Re: Campus Construction

    They never stop. Working on the University Ave facade of building 1 on Easter Sunday. Guy on malift closest to camera is cleaning up mortar splatter and other things around window openings. The guys in the other manlift are caulking and weather sealing around window openings. This side of building 1 is almost totally weather proofed.

    building-1-1

    The caulking crew. the rolls of material on the basket are foam backer rod used to back up the caulking.

    building1-4

    Building 1in background and building2 in the foreground as seen from a side entrance to McLauren Gym.

    rose-1

    Building 1 alley facade as seen from the service drive to the student union. The sheet rock on the second to fourth floor has been finished. They have delivered literally tons of sheet rock to the site over the last few weeks and they are not finished yet.

    building1-2


    Building 1 alley facade as seen from University Ave. Split concrete columns are stored near the main entrance.

    building1-3

    Building 2 alley facade as seen from the student union service drive.

    building2-1

    Building 2 as seen from the side walk in the front of McLauren Gym

    building2-2

    Building 2 alley facade as seen from University Ave. Student Union, Wharton Hall and a portion of the old Saucier clinic are seen in the background.

    building2-3


    Rotten facia board discovered on Harris Hall when they placed a new roof on the building.

    harris-1


  11. #491
    Join Date
    Apr 2012
    Location
    Pakistan
    Posts
    1

    Default nothing else

    you are right


  12. #492
    Boomer's Avatar
    Boomer is offline Ragin Cajuns of Louisiana Ragin' Cajuns Greatest Fan Ever
    Join Date
    Jun 2002
    Posts
    18,592

    Default Re: Campus Construction

    Quote Originally Posted by HelmutVII View Post
    They never stop. Working on the University Ave facade of building 1 on Easter Sunday. Guy on malift closest to camera is cleaning up mortar splatter and other things around window openings. The guys in the other manlift are caulking and weather sealing around window openings. This side of building 1 is almost totally weather proofed.

    building-1-1

    The caulking crew. the rolls of material on the basket are foam backer rod used to back up the caulking.

    building1-4

    Building 1in background and building2 in the foreground as seen from a side entrance to McLauren Gym.

    rose-1

    Building 1 alley facade as seen from the service drive to the student union. The sheet rock on the second to fourth floor has been finished. They have delivered literally tons of sheet rock to the site over the last few weeks and they are not finished yet.

    building1-2


    Building 1 alley facade as seen from University Ave. Split concrete columns are stored near the main entrance.

    building1-3

    Building 2 alley facade as seen from the student union service drive.

    building2-1

    Building 2 as seen from the side walk in the front of McLauren Gym

    building2-2

    Building 2 alley facade as seen from University Ave. Student Union, Wharton Hall and a portion of the old Saucier clinic are seen in the background.

    building2-3


    Rotten facia board discovered on Harris Hall when they placed a new roof on the building.

    harris-1

    Great that they found this wood when they did

    I am sure it saved a lot of money later!!!


  13. #493
    CajunAmos's Avatar
    CajunAmos is offline Ragin Cajuns of Louisiana Ragin' Cajuns Greatest Fan Ever
    Join Date
    Jan 2003
    Location
    Lafayette
    Posts
    5,560

    Default Re: Campus Construction

    As much as I enjoy the photo documentation of progress, I have to say I'm looking forward to the day when they are finished as well.

    Maybe we can then start a couple of new ones......hmmmmmmmmm............maybe the new student union construction & the new baseball grandstand construction.


  14. #494
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    2,813

    Default Re: Campus Construction

    I too, am looking forward to them being finished. It would be nice to have a little peace and quiet on the weekends. The almost constant sound of motion announciators is getting old. With at least two dozen pieces of equipment on the site and moving all the time it gets to a point that it's about the only thing you hear. I can't see how this can be a safety measure because if you hear them all the time then they are almost useless. I keep telling myself the more often they work the quicker they finish.

    My neighbor has two scarlet Macaws, one of them has learned to mimic the motion announciator sound so I guess the affects of construction will linger. It's OK though, because the bird does not do it all the time and it is kind of amusing.

    Student Union Construction is supposed to start sometimes this fall, so this thread could live on or morph into "Student Union Construction". Who knows.


  15. #495
    Join Date
    Sep 2011
    Location
    Lafayette
    Posts
    2,917

    Default Re: Campus Construction

    Quote Originally Posted by HelmutVII View Post
    My neighbor has two scarlet Macaws, one of them has learned to mimic the motion announciator sound so I guess the affects of construction will linger. It's OK though, because the bird does not do it all the time and it is kind of amusing.
    From the pics that you say are from your driveway I can tell what neighbor you're referring too. I would often ride my bike that way when I was going to and from class. Those dang Macaws would always scare the crap out of me when I would turn on Gordon. First time I went that way I thought there was someone yelling at me on the other side of the fence. They have great mimicking skills.

  16. #496
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    2,813

    Default Re: Campus Construction

    Quote Originally Posted by CajunFan3406 View Post
    From the pics that you say are from your driveway I can tell what neighbor you're referring too. I would often ride my bike that way when I was going to and from class. Those dang Macaws would always scare the crap out of me when I would turn on Gordon. First time I went that way I thought there was someone yelling at me on the other side of the fence. They have great mimicking skills.
    When the birds act up when I have visitors I tell them that my neighbor beats his wife. LOL

  17. #497
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    2,813

    Default Re: Campus Construction

    A little bit different view from the Hebrard University intersection. Part of building 1 is to the left and Randolph is to the right. The middle is the far end of building 1 (the end across from the old Saucier clinic). They are starting to clean up in the courtyard area. This will be the new rose garden.

    building1-1

    Building 1 as seen from the side of Mc Lauren Gym.

    Building1-2

    Alley facade of building 1 as seen from East University.

    building1-5

    Somebody must have missed something or there is something wrong with these two precast elements.

    building1-4

    The almost finished University Ave. entrance to building 1

    building1-3

    Both buildings as seen from the top of the Olivier Parking Tower. Building 1 is to the left.

    both1-1

    Building 2 as seen from the Student Union service drive.

    building2-1

    Building 2 from the side of McLauren Gym

    Building2-2

    Building 2 as seen from the McKinley Street University Ave intersection

    building2-3

    Randolph Hall getting a new roof and new second story windows.


    randolph


  18. #498
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    2,813

    Default Re: Campus Construction

    Getting harder to find exterior work being done on the project. They have until August to be finished (just a little over four months) They will make it with the first building for sure. They second building will be close. Renovation of Harris Hall and Randolph will also be close. They haven't done much on Buchanan Hall and I'm guessing they may be saving that for last in case they run out of money or it may not be a high priority.


    Cleaning up and installing drainage in the courtyard area behind building 1, Buchanan and Randolph halls. This will be the new Rose Garden area.

    building1-1

    Prefabricated drainage junction box (JB A-4) setting in front of building 1


    jba-4

    They opened up a rear entry to Randolph Hall. You can see through it to the rear entrance to building 1. Looking closer and you can see through to building 2 beyond and then a little bit of Harris Hall through the opening to building 2.

    randolph-1


    Building 1 as seen from the side of McLauren Gym

    building1-2


    Building 1 alley way facade as seen from University Ave. They are about two or three weeks from being finished with all the exterior work on Building 1.

    building1-3


    Alley way between the two buildings as seen from the Student Union service drive.

    building1&2


    Building 2 as seen from the front of the old Saucier Clinic

    building2-1

    Building 2 brick work as seen from the McKinley University intersection.

    building2-2

    Building 2 University Ave facade as seen from McKinley University intersection. Building 2 is not exactly like building 1. The University Ave facade was shortened to save the two Oak trees in the photo above. They kept the same number of rooms by constructing the wing they are bricking in the photo above.

    building2-3

    Building 2 Alley facade as seen from University Ave.

    building2-4


  19. #499
    Join Date
    Jan 2003
    Posts
    4,967

    Default Re: Campus Construction

    Thanks again for the updates!


  20. #500
    Join Date
    Jan 2002
    Location
    Louisiana A
    Posts
    17,473
    Blog Entries
    2

    Default Re: Campus Construction

    So cool to look at the progress.

    Thanks Helmut


Page 25 of 37 FirstFirst ... 15 21 22 23 24 25 26 27 28 29 35 ... LastLast

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •