Thread: Campus Construction

  1. #381
    Join Date
    Aug 2004
    Location
    Louisiana
    Posts
    493

    Default Re: Campus Construction

    It is so wonderful being able to see photos of what is happening on campus. Thank you for the record of the construction that you are keeping. I like it when I see that you have a post on the construction.


  2. #382
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    2,854

    Default Re: Campus Construction

    Front columns of Huger Hall being installed. They come split in half and they are bonded together on site. The middle two columns have straps around them to hold it together until the adhesive sets.

    huger-columns

    A spare or broken column half. Capitols and bases are to the rear.

    column-half


    Finishing touches being done to the rear of Huger Hall. Scheduled to be finished around Thanksgiving.

    hyger-rear

    We will see if they were able to improve on the installation of the AC lines over the installation behind Baker.


    A landscape feature between Baker and Huger Halls. Hamilton Hall is in the background, Baker is to the left.

    landscape-feature


  3. #383
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    2,854

    Default Re: Campus Construction

    Quote Originally Posted by LuLu View Post
    It is so wonderful being able to see photos of what is happening on campus. Thank you for the record of the construction that you are keeping. I like it when I see that you have a post on the construction.
    Thank you very much. Being that my house is right across the street it's really not that hard to do. I started out photgraphing on Saturdays but since they have moved to the Rose Garden area I'm thinking I will have to photograph on Sunday as i will have to sneak in and the best day to do that is when they are not working that much. At first they were working seven days a week but lately they are taking Sunday off.

  4. #384
    Boomer's Avatar
    Boomer is online now Ragin Cajuns of Louisiana Ragin' Cajuns Greatest Fan Ever
    Join Date
    Jun 2002
    Posts
    18,733

    Default Re: Campus Construction

    Just an idea ---How about having some photo shop give a beautiful album that you can give the history to the university and the company doing the work---The price will be a huge contribution to RCAF---Top level only will get the album!!! What say you????


  5. #385
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    2,854

    Default Re: Campus Construction

    Quote Originally Posted by Boomer View Post
    Just an idea ---How about having some photo shop give a beautiful album that you can give the history to the university and the company doing the work---The price will be a huge contribution to RCAF---Top level only will get the album!!! What say you????
    Once a month, I drop off a copy of all the photos (the not so good, the bad and the ugly) to Dr. Savoie, Troy Dunnam (the general superintendent) and Steve Oubre. What they do with them after that I don't know.

    The general contractor knows somebody with a plane that they regularly fly to Houston. They make a swing over the campus and take some really nice aerial shots.

  6. #386
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    2,854

    Default Re: Campus Construction

    Huger is very close to being finished on time for Thanksgiving.

    The entrance to Huger getting it's finishing touches.

    huger-1

    Huger as seen from Taft Tulane intersection.

    Huger-2

    Landscape features and walkways under construction between Huger and Baker. Baker is to the left.

    huger-3

    They have used the parking lot behind Hamilton Hall as a storage area and there is very little material there now. In two weeks it will all be gone.


  7. #387
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    2,854

    Default Re: Campus Construction

    The Rose Garden construction continues to progress.

    Foreground is concrete slab placed early morning of Friday 11/11/11. They are wrecking forms on this area and getting ready to place concrete in the area in the background.

    rose-1

    Another view of concrete placed on 11/11/11

    rose-2

    The above two photos taken from University Ave.

    First residence hall in background. They are working to place concrete on the third section probably early this coming week. The foreground is foundation prep work for the second residence hall. The white circles in the ground are the tops of compacted sand Geopiles installed by the equipment to the left of the photo.

    rose-3

    A close up of the compacted sand Geopiles.

    rose6

    Another view of the first residence hall but more to the right.

    rose-4

    Two stair wells under construction for the second residence hall. University Ave and McKinley intersection is to the right.

    rose-5

    The above four photos taken from Harris Hall fire escape.

    View of the first concrete slab placement in foreground and second concrete slab placement in background. Randolph Hall is to the rear of the camera.


    rose8


    This is the future alley between the two residence halls. A lot of work in one week. Photo taken from the service driveway to the student union on Buocher Street.

    rose7


  8. #388
    Boomer's Avatar
    Boomer is online now Ragin Cajuns of Louisiana Ragin' Cajuns Greatest Fan Ever
    Join Date
    Jun 2002
    Posts
    18,733

    Default Re: Campus Construction

    Unreal---thanks!!!


  9. #389
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    2,854

    Default Re: Campus Construction

    A day late due to ISP problems.

    Huger is getting very close to being finished. This is a view from Tulane Ave while standing in the service drive between Huger and Hamilton.

    huger-1

    A view from the Taft Tulane intersection.

    huger-2

    A view between Huger and Baker with Hamilton to the rear. It looks like it will be a very nice space.

    huger3

    The rear of Baker Hall. Looks like they will have room for benches and other things. There is very little material stored in the parking lot behind Hamilton Hall. They were shooting to be finished for Thanksgiving but I don't think they will make it. I give them two weeks, give or take a day or two.

    baker-1


  10. #390
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    2,854

    Default Re: Campus Construction

    A panoramic view of the Rose Garden construction. All of the concrete slab for the first hall is finished and they have started the first floor framing. They are continuing to do foundation and stair well/elevator shaft work for the second hall.

    rose-pano

    Tying rebar steel for foundation of second Rose Garden Hall. Rain expected on Tuesday (11/22) so they were working on Sunday.

    rose-1

    Close up of corner nearest Randolph Hall. Randolph Hall is to the rear of the camera.

    rose-4


    OOPS. Somebody made a mistake. They had to scab on a bit of concrete to make the building fit the foundation. This is the corner closest to Randolph Hall.

    rose3


    View of future alley between the two new residence halls.

    rose2

    I saw my neighbor yesterday afternoon and he said as soon as the residence halls are finished they will start on the Student Union renovation. This may be the longest thread in Ragin Pagin history.


  11. #391
    Join Date
    Jun 2007
    Location
    Lafayette,LA
    Posts
    3,938

    Default Re: Campus Construction

    Quote Originally Posted by HelmutVII View Post
    This my be the longest thread in Ragin Pagin history.
    But one of the most important!

  12. #392
    Join Date
    Jan 2002
    Location
    Louisiana A
    Posts
    18,358
    Blog Entries
    2

    Default Re: Campus Construction

    Quote Originally Posted by HelmutVII View Post
    This my be the longest thread in Ragin Pagin history.
    certainly the most picturesque.

    Thanks

  13. #393
    Join Date
    Oct 2010
    Location
    Houston, Texas
    Posts
    265

    Default Re: Campus Construction

    This thread makes me wantto go back to school...but not back to class


  14. #394
    Join Date
    May 2005
    Location
    Old Jef erson...
    Posts
    1,386

    Default Re: Campus Construction

    So jealous after living in the Pit of Despair that was Voorhies Hall.


  15. #395

    Default Re: Campus Construction

    Quote Originally Posted by locoguano View Post
    So jealous after living in the Pit of Despair that was Voorhies Hall.
    Lol, I'm with ya there! V-TOWN!!

  16. #396
    Join Date
    Aug 2003
    Location
    Youngsville, LA
    Posts
    3,918

    Default Re: Campus Construction

    Quote Originally Posted by locoguano View Post
    So jealous after living in the Pit of Despair that was Voorhies Hall.
    Count me in that number as well! (On both counts!)

  17. #397
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    2,854

    Default Re: Campus Construction

    Rain Tuesday 11/22 along with Thanksgiving and rain again on 11/26 rsults in not much work this past week. There was no work from Thanksgiving to today Sunday 11/27. I think that is the first time since construction began that there has been a suspension of work for that long. Today Sunday 11/27 there was one guy on the site running pumps to dewater excavations so they could work tomorrow. It was kind of nice to have some quite time in the area.

    This is a composite photo of the first Rose Garden Residence hall. There is a large pile of prefabricated truss joists in the left foreground. It will be a while before they need these because the interior walls are not framed yet. Maybe by the end of this coming week if they get good weather.

    rose-2

    Composite photo of the second Rose Garden residence hall. Pretty muddy from an all day rain on Saturday.

    rose-1

    Foundation for a stairwell for the second Rose Garden residence hall. Water in the excavation to the rear was being pumped out today.

    rose-3

    Composite photo of the view from Boucher Street at the Student Union service driveway. The middle is the future alley way between the two new buildings. to the left is Buchanan Hall to the right is Harris Hall. The water in the street to the right of the red pickup truck is from pumps being used to dewater the site.

    rose-4

    Composite photo of the first Rose Garden residence hall from the rear of the Vermilion Office.

    rose-5


  18. #398
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    2,854

    Default Re: Campus Construction

    Not much to show around Baker-Huger due to rains and holidays.

    Plenty of mud between Baker Huger. Baker to the right. Huger to the left.

    bager-huger-1

    Light poles waiting to be installed.

    baker-huger-3

    Parking lot behind Hamilton Hall almost cleared of construction materials.

    baker-huger-2

    A hidden patio behind Burke-Hawthorne Hall. Burke theater is to the right. The new addition is to the left. It is very nice and the casual campus visitor will never find it.

    burke-hawth-patio

    The recent rains have caused the resurrection ferns to resurrect. There are MILLIONS of acorns on campus. I'm thinking there will be a squirrel population boom.

    res-fern


  19. #399
    Join Date
    Sep 2009
    Location
    Behind Bisbano's!
    Posts
    999

    Default Re: Campus Construction

    Quote Originally Posted by HelmutVII View Post

    A hidden patio behind Burke-Hawthorne Hall. Burke theater is to the right. The new addition is to the left. It is very nice and the casual campus visitor will never find it.

    burke-hawth-patio

    I LOVE this patio. I'm always there if I have classes in Burke.

  20. #400
    Join Date
    Sep 2009
    Location
    Lafayette, LA
    Posts
    592

    Default Re: Campus Construction

    Quote Originally Posted by I Cajun Me View Post
    Lol, I'm with ya there! V-TOWN!!
    Just had to post to Represent for Stokes! 1st 2 semesters I was paired up with some very strange roomates.

Page 20 of 37 FirstFirst ... 10 16 17 18 19 20 21 22 23 24 30 ... LastLast

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •