    Construction on Huger Hall continues to progress.

    North Facade of Huger Hall as seen from Tulane Avenue. Hamilton Hall is to the right.

    huger-tulane-1

    South facade of Huger Hall as seen from Taft Tulane intersection. It looks like they don't have the precast decorative insets (between the second and third floor windows) and they are leaving the spaces open for now.

    huger-taft-1

    North Facade of Huger Hall. Hamilton Hall is to the left and Baker is to the rear and right.

    huger-baker-1

    Rear of Huger Hall. Baker Hall is to the rear of the camera.

    huger-baker-2


    OOPS, some really bad mechanical and electrical planning at one of the rear entrances to Baker Hall.

    OMG


  2. #322
    Boomer's Avatar
    Boomer is offline Ragin Cajuns of Louisiana Ragin' Cajuns Greatest Fan Ever
    Join Date
    Jun 2002
    Posts
    18,594

    Default Re: Campus Construction

    Quote Originally Posted by HelmutVII View Post
    OOPS, some really bad mechanical and electrical planning at one of the rear entrances to Baker Hall.
    That is why they have landscape designers---Is it a mess up or what???? from the no clue department!!!!

  3. #323
    Join Date
    Apr 2006
    Location
    Lafayette, LA
    Posts
    4,221

    Default Re: Campus Construction

    Quote Originally Posted by Boomer View Post
    That is why they have landscape designers---Is it a mess up or what???? from the no clue department!!!!
    sure they can have it hidden by landscaping but you certainly don't like to have areas that can potentially be problems, this was definitely a mistake

  4. #324
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    2,813

    Default Re: Campus Construction

    To be fair, they don't plan on completing the landscaping here until they finish both dorms. However, it does not appear to be well thought out. We will see if the same thing happens on Huger at the same spot. If it does then it was intended to be that way and if not then they made a mistake on Baker. (Or they figured out a better way to do it on Huger)


  5. #325
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    2,813

    Default Re: Campus Construction

    Brick work and other exterior work is finishing up. Looks like they got some precast concrete accent pieces in this week.

    Huger Hall as seen from Taft street.

    huger-taft

    North facade of Huger Hall. Hamilton hall is to the left. Half of this side was bricked last week,

    huger-baker-1

    Installing soffit and facia on Tulane Avenue Facade

    soffit-facia


    Literally a ton of copper went into this building. I don't think they are finished yet. Because copper is so expensive, empty spools are the only spools they leave out like this.

    copper-spools


  6. #326
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    2,813

    Default Re: Campus Construction

    Demolition of old Baker and Old Huger started this past Wednesday afternoon. They didn't waste any time. This is what it looked like on June 11, 2011. On Monday September 5, both buildings were standing with minimal demolition accomplished.

    huger-baker-bonin


    This is the remains of old Baker Hall on Friday September 9, 2011

    baker-demo-1

    Demolition of old Huger Hall on Friday September 9, 2011. The crane in the background is lifting materials for new Huger Hall on Tulane Ave.

    huger-demo-1


    The remains of Baker-Huger on September 10, 2011

    baker-huger-ramains-1

    The approximate location of the entrance to Baker Huger. Buchanan Hall is to the rear.

    baker-huger-demo2

    The only building still standing that is scheduled for demolition is Bonin Hall. I suspect it won't be long although I saw that they had the top floor windows in Bonin sealed off like they were doing more asbestos remediation work.


  7. #327
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    2,813

    Default Re: Campus Construction

    construction on Huger Hall is progressing at a very rapid pace. These are photos taken on the afternoon of September 17 before I left for the football game.

    View of Huger Hall from the Taft Tulane Intersection.

    huger-taft

    View of the rear of the south end of Huger Hall

    huger-rear-1

    View of the rear of the north end of Huger Hall

    huger-rear-2

    Close up of the attachment of one of many precast concrete accent pieces. (metal brackets at the middle and top sides of the unit)

    concrete-section

    Left over sign from Denbo/Bancroft because not too much grass to park on here.

    huger-parking

    Rear of Baker Hall showing more unsightly mechanical lines (the hose on the ground is for the grass sprinkler and is temporary).

    oops-1

    More mechanical lines. Gas lines cannot be installed under slabs (by code)

    oops-2

    The above two photos along with the photo a few weeks back are at similar locations on the building. I suspect that there is a fire wall in the building that either cannot be penetrated or the Fire Marshall said that it could not be penetrated (even with fire stopping). The fire Marshall enforced the NFPA Life Safety code to the "T" and they are really particular about dorm type occupancies.

    A very nice McKinley Street facade of the parking garage (It almost looks like a class room building). The credit Union offices are pretty close to being finished. I give them about 2 to 3 weeks.

    garage-mckinley

    After speaking to the general Superintentent for Juneau I found out that the different brick color was intentional because they wanted to Identify the Credit Union as a different use in the same building.


  8. #328
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    2,813

    Default Re: Campus Construction

    Old Baker and Huger Halls are debris piles

    Pick up truck is parked where Huger once stood two weeks ago.

    baker-huger-remains-1

    Debris pile of Baker Hall

    baker-debris

    More debris piles

    baker-debris-2

    Another view from the fire escape for Harris Hall. Bonin Hall is to the right. Dirt pile to the left is where Evangeline Hall once stood.

    bonin-9-17

    Really starting to chew on Bonin Hall on Sunday September 18, 2011

    bonin9-18-1

    Another view of Bonin Demolition. The water stream is to keep the dust down.

    bonin9-18-2


  9. #329
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    2,813

    Default Re: Campus Construction

    View of construction (demolition) from the driveway to my home. I really am glad they sprayed water on the debris pile because the dust would be unbelievable.

    driveway-view


  10. #330
    Join Date
    Jan 2002
    Location
    Louisiana A
    Posts
    17,485
    Blog Entries
    2

    Default Re: Campus Construction

    Simply amazing stuff HelmutVII, I can't thank you enough.


  11. #331
    Join Date
    Apr 2006
    Location
    Lafayette, LA
    Posts
    4,221

    Default Re: Campus Construction

    this is going to look incredible when completed


  12. #332
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    2,813

    Default Re: Campus Construction

    Another good week of weather so plenty of work done.

    Demolition continues on Bonin Hall. This is a view from the rear of Randolph Hall.

    bonin-demo3

    Bonin as seen from University Ave.

    bonin-demo-2

    More chewing on Bonin Hall as seen from the rear. McLauren Gym is to the right rear of the camera.

    bonin-demo

    Bonin Light fixture hanging on for dear life. (But not for long).

    bonin-light


    Given that Bonin was a three story building and much bigger than Baker and Huger, it's taking a little longer to demolish. As usual, debris handling is the limiting factor. They could have taken the building down in three or four days but they would have had a mess on the ground and it would have taken forever to clean it up.

    Yellow pin flags mark the layout for foundation work for one of the new rose garden dorms. This is where Huger used to be. Debris from Bonin is in the background. Photo taken from the rear of Randolph.

    foundation

    If they hold true to form the two new dorms to be built in the Rose garden area will be called Evangeline and Bonin.


  13. #333
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    2,813

    Default Re: Campus Construction

    Cleaning and painting the exterior of Huger Hall.

    Cleaning Taft Street Facade.

    huger-cleaning-1

    North facade of Huger. The dirty line on the brick between the second and third floor is where waste mortar was splashed on to the brick when it rained. Hamilton Hall is to the left. Taken from the top floor of the new parking garage.

    huger-1

    They spray a chemical cleaner on the brick, let it set a while and hit it with a pressure washer. They scrape or brush when needed.

    huger-cleaning-2

    One of two caulking crews working today. The spools on the man lift are a foam backer rod. It is used to support the caulk if they have to span a deep or wide crack.

    huger-caulking-2


    The other caulking crew.

    huger-caulking

    Painting soffit and facia boards.

    huger-painting

    Tucking bricks around precast concrete accent piece.

    huger-tuck


  14. #334
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    2,813

    Default Re: Campus Construction

    This is Baker Residence hall with the lights along the sidewalk finished. The students look like they are settling in nicely. There is plenty of activity in the evenings, plenty of light for safety and the campus police have regular foot patrols.

    baker

    Photo is taken from the new parking garage. They started moving furniture into the credit union offices so I suspect they will be moving in soon.


  15. #335
    Join Date
    Jan 2002
    Location
    Louisiana A
    Posts
    17,485
    Blog Entries
    2

    Default Re: Campus Construction

    Are those the same style lights as the ones along the walk on Johnston Street and Cajun Dome Blvd?


  16. #336
    Join Date
    Jun 2007
    Location
    Lafayette,LA
    Posts
    3,897

    Default Re: Campus Construction

    Quote Originally Posted by Turbine View Post
    Are those the same style lights as the ones along the walk on Johnston Street and Cajun Dome Blvd?
    Sure are Turb.

  17. #337
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    2,813

    Default Re: Campus Construction

    I took photos on Friday this week because I will be cooking for tailgating on Saturday. Progress on Huger Hall continues. However, not much to show from the outside and most of the work is on inside. Brick work is just about finished. No photos of Huger this week because lots of work in the rose Garden.

    Constant chewing on Bonin this week leaves not much left standing. they should be finished taking it down by Sunday. A few photos of Bonin Demoliotion.

    Remains of the north end of Bonin Hall

    bonin-3

    Remains of the Middle of Bonin Hall

    bonin-2

    Remains of the South end of Bonin Hall

    bonin-1

    More Bonin Demolition from a different view.

    bonin-5

    Roof coming down

    bonin-4

    Site prep work continues for one of the new Rose Garden dorms

    foundation-work

    Geopier equipment moved in and ready to start work. The auger machine (on right) opens a vertical hole while the tamping machine (on left) compacts select material in the hole making a solid foundation. The company must do well because it's all brand new Cat equipment.

    cat-geopier


    White pin flags mark the locations for the Geopiers

    geopier-locations

    The red blob is a tent they use for staging and outdoor plan tables. I like the color.


  18. #338
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    2,813

    Default Re: Campus Construction

    New lights are going up around campus here are a few photos of some of them.

    Lights along St. Mary

    st-mary-lights

    Lights in the quad

    quad-lights

    All of the light poles and fixtures match other new light poles and fixtures recently installed on campus at other locations and along Johnston Street to Cajun Dome Blvd to the Research park. They are very nice


    A couple of views of the recently renovated Girard Hall. They gutted the building and did a very nice job inside. All new energy efficient windows.


    Note the same light poles and fixtures here too.

    girard-1


    girard-2

    A local Architectural firm Corne-Lamaire did the design work M.D. Descant was the contractor.


  19. #339
    Join Date
    Sep 2006
    Posts
    2,578

    Default Re: Campus Construction

    Again, great pics. Thanks!
    The lights do look nice, very classy. It's amazing how the Quad looks, compared to the old dirt trails we had.


  20. #340
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    2,813

    Default Re: Campus Construction

    Quote Originally Posted by ULGrad@HOU View Post
    Again, great pics. Thanks!
    The lights do look nice, very classy. It's amazing how the Quad looks, compared to the old dirt trails we had.
    Yest the quad does look nice and I understand they are planning to improve the landscaping too.

Page 17 of 37 FirstFirst ... 7 13 14 15 16 17 18 19 20 21 27 ... LastLast

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •