Thread: Campus Construction

  1. #241
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    3,030

    Default Re: Campus Construction

    New Baker Hall on July 9, 2011. They are cleaning up the storage yard and hauling out the limestone they used to stabilize the site. They are forming up for a sidewalk along the front of the building. Finally getting to see what the finished product might look like

    baker1-july9

    New Baker Hall with new parking garage on left. Entrance to new Baker Hall is taking shape.

    baker2-july9

    Parking Garage as seen from Taft Street

    garage-taft

    Parking Garage As seen from the rear of Angelle Hall on McKinley street

    garage-angelle


  2. #242
    Join Date
    Sep 2009
    Location
    Behind Bisbano's!
    Posts
    1,026

    Default Re: Campus Construction

    I love that they're trying to keep the same architectural styles as the older buildings on campus. Griffin and Wharton do the job, but they just don't look nearly as nice.


  3. #243
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    3,030

    Default Re: Campus Construction

    Work on the Horizon.

    Existing Health Services Building to be Demolished after renovation of OK Allen Hall is finished.

    demolish-health

    Old Student Union/ Bowling Alley/ Student Services Building to be demolished after renovation of OK Allen Hall is finished. Won't be sorry to see this go.

    deomilsh-old-stu

    Guillory and Corona Halls to be Demolished after renovation of OK Allen hall is finished. Won't be sorry to see these go either.

    demolish-guillory-corona


  4. #244
    Boomer's Avatar
    Boomer is online now Ragin Cajuns of Louisiana Ragin' Cajuns Greatest Fan Ever
    Join Date
    Jun 2002
    Posts
    19,054

    Default Re: Campus Construction

    Quote Originally Posted by HelmutVII View Post
    _ Work on the Horizon.

    Existing Health Services Building to be Demolished after renovation of OK Allen Hall is finished.

    demolish-health

    Old Student Union/ Bowling Alley/ Student Services Building to be demolished after renovation of OK Allen Hall is finished. Won't be sorry to see this go. Anyway brings back some memories---Yearbook dealings, feeding alligators, falling in love every day in the student union, pep rallies inside, treatment for VD in infirmary (JOKE), treated for the flu (NO JOKE), Letters from my girl in NO--it use to be the post office also

    -training table duties---great times!!!!

    deomilsh-old-stu

    Guillory and Corona Halls to be Demolished after renovation of OK Allen hall is finished. Won't be sorry to see these go either.

    demolish-guillory-corona _

    Somebody somewhere Somehow mentioned that where these buildings had been would be a Village concept going from the new dorms to the student Center

    -This would make me think about finishing up and getting a phd in anything---Can you live in the dorms and not be a student---What a retirement idea!!!!


  5. #245
    Join Date
    Jan 2002
    Location
    Louisiana A
    Posts
    19,893
    Blog Entries
    2

    Default

    Quote Originally Posted by Boomer View Post
    Can you live in the dorms and not be a student---What a retirement idea!!!!
    There would be a waiting list for sure.

    On a brighter though dire note; New dorms would be available on a fairly regular basis.

    igeaux.mobi

  6. #246
    Join Date
    Nov 2006
    Location
    Lafayette, Louisiana
    Posts
    650

    Default Re: Campus Construction

    Quote Originally Posted by HelmutVII View Post
    _ New Baker Hall on July 9, 2011. They are cleaning up the storage yard and hauling out the limestone they used to stabilize the site. They are forming up for a sidewalk along the front of the building. Finally getting to see what the finished product might look like

    baker1-july9
    Band director said the band field is going to be put in next week, giving the new grass about a month to take hold before band camps starts.

    The reverb is going to be HORRIBLE. I kinda feel bad for the students living in the dorm facing the field, as the band faces that way and not the parking tower.

  7. #247
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    3,030

    Default Re: Campus Construction

    They still haven't started with the demolition of the old dorms along University. The only dorm that still has electric power is Bonin. I suspect that once they de-energize Bonin it won't be long.

    New Huger from Taft/Tulane intersection

    huger-taft

    New Baker and New Huger from Taft/Tulane intersection

    huger-baker

    They are taking a little bit different course of construction on new Huger. I guess they learned things on Baker and are able to speed things up a little bit. New Huger is about where new Baker was in May.

    New Baker and parking garage as seen from Taft

    baker-parking

    New Baker on July 16, 2011. The roof vents along the top are being stored on the roof. the ones along the bottom (in a straight line) are installed.

    baker-7-16

    Placing concrete for a sidewalk along the front of New Baker hall. the three boxes at the rear of the transit mix truck are visqueen. They needed it about 30 minutes later as it started to rain.

    baker-sidewalk

    Welding a joint in the Parking Garage.

    parking-welding

    Stored Landscape materials by the parking garage. New concrete paving on the first level of the parking garage. I would suspect that they will be able to drive up and down the parking garage pretty soon.

    parking-landscape

    New location for Band directors stand against the Taft Street parking garage. Looks like the band will reverse it's practice field from what it was before.

    band-director.


  8. #248
    Join Date
    Jul 2005
    Posts
    110

    Default Re: Campus Construction

    This is awesome. Can't wait to see what it looks like finished. I'm also glad to see Corona/Guillory/etc. will be gone very soon. Eyesores.

    What's the status on the union renovation/expansion?


  9. #249
    Join Date
    Jul 2011
    Posts
    17

    Default Re: Campus Construction

    I read in some article from the Advocate that Corona and the other Ugly one, may be put on hold I believe they are having some trouble finding space for the offices.

    So instead they will focus on starting remolding the inside of the union.


    Will the cafeteria have to be moved for renovation? If so where will they move it too?


  10. #250
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    3,030

    Default Re: Campus Construction

    Health Services and other services that are in Guilllory and Corona to move will move to OK Allen once it's renovated. Renovation of OK allen was funded by Student Union funds. OK Allen was in pretty good shape considering it was almost 100 years old. It had started as and "L" shaped building had an addition to make it a "T" shaped building then two more additions to the rear (to the quad). There was some rot found on the roof and all of the roof trim had to be removed due to rot. It still had the Kitchen area in tact but no equipment.

    I would suspect that things would get going after OK Allen is renovated. There is an energy efficiency project going on now that is upgrading the cooling tower and chilled water loop that is supplied by the existing Student Union cooling tower and mechanical system. I would guess that is in anticipation of the renovation but I'm not 100% sure of that. I am not involved in the Student Union Renovation project (other than OK Allen) so I don't know particulars.


  11. #251
    Join Date
    Dec 2003
    Posts
    635

    Default Re: Campus Construction

    VII sure did some legwork on this project.


  12. #252
    DaddyCajun's Avatar
    DaddyCajun is offline Dig deep UL will Prosper! Ragin' Cajuns Greatest Fan Ever
    Join Date
    Aug 2002
    Location
    Da Cro
    Posts
    5,824

    Ragin' Cajuns Re: Campus Construction

    Is the area for the band to practice any smaller than prior to the new construction? If so, will the area be large enough for the band to actually practice formations at its current size and/or at 300+ strong?


  13. #253
    Join Date
    Feb 2006
    Location
    Mowata, LA
    Posts
    733

    Default Re: Campus Construction

    Quote Originally Posted by ULEverywhere View Post


    So instead they will focus on starting remolding the inside of the union.

    Normally I'm not a stickler for spelling but this is hilarious. "Remolding". I'm sure the Union has plenty of mold already. But, I'm sure they could always stand to remove it all and apply a fresh coat of mold.

  14. #254
    Join Date
    Jul 2011
    Posts
    17

    Default Re: Campus Construction

    Quote Originally Posted by Kal View Post
    _ Normally I'm not a stickler for spelling but this is hilarious. "Remolding". I'm sure the Union has plenty of mold already. But, I'm sure they could always stand to remove it all and apply a fresh coat of mold. _
    Lol well deserved, they can recycle the mold from the older dorms. Maybe Stokes?

  15. #255
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    3,030

    Default Re: Campus Construction

    Quote Originally Posted by DaddyCajun View Post
    _ Is the area for the band to practice any smaller than prior to the new construction? If so, will the area be large enough for the band to actually practice formations at its current size and/or at 300+ strong? _
    It's about the same size (20 to 20). It should be fine.

  16. #256
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    3,030

    Default Re: Campus Construction

    Still removing asbestos from old dorms along University Ave. They have returned to Evangeline Hall for more asbestos removal. Looks like they must have found some more. The crawl space under Bonin Hall is sealed off. That must be a hell of a job removing asbestos under that building.

    New Huger from Tulane Ave.

    huger-tulane

    New Huger on left, new Baker to the rear, New Parking Garage far rear and to the middle and Hamilton Hall on right

    huger-baker-tulane

    New Baker on July 23, 2011

    baker7-23



    New Baker Hall as seen from Taft Street. Sidewalk was placed today.

    baker-taft1


    Another view of New Baker seen from Taft Street

    baker-taft2

    Preparing columns for installation

    baker-columns

    Parking garage as seen from McKinley Street with Angelle Hall to the left

    parking-angelle

    One of the McKinley Street entrances being prepared for concrete placement.

    parking-driveway


  17. #257
    Join Date
    Jul 2011
    Posts
    17

    Default Re: Campus Construction

    Were the old dorms supposed to be torn down before the end of the summer?


  18. #258
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    3,030

    Default Re: Campus Construction

    Quote Originally Posted by ULEverywhere View Post
    _ Were the old dorms supposed to be torn down before the end of the summer? _

    I think so but it looks like they are finding more Asbestos in the buildings and it is taking a long time. It won't take long to demolish them once they get started, debris removal will be the limiting factor.

  19. #259
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    3,030

    Default Re: Campus Construction

    More asbestos removal in Evangeline Hall. This is the building they started with asbestos removal and they have returned to it. Looks like they are back in old Baker and Huger too. They have never left Bonin once they started. Asbestos removal is a slow and tedious job that requires meticulous record keeping.

    evangeline-asbestos

    New Baker Hall on July 30, 2011. They moved in furniture last week, they are installing gutters and the entry columns, landscaping is started too. The landscape sprinkler system is being installed on the band practice field. Sprinkler heads are marked by a white pipe (like the one to the right of the dozer). Landscape sprinklers are being installed around New Baker Hall too.

    baker-july-30

    New Baker Hall as seen from Taft Street.

    baker-taft


    New Baker Hall as seen from the south east corner of the new parking garage (adjacent to Angelle Hall)

    baker-angelle

    Installing entry columns at New Baker Hall

    baker-columns

    Parking Garage July 30, 2011, Sidewalk is formed and should be placed Monday. Security fencing is almost complete on the first level.

    garage-july30

    Parking garage adjacent to the rear of Angelle Hall. Driveway to Angelle Hall is formed and should be placed Monday.

    garage-angelle

    McKinley Street entrance to parking garage next to Angelle Hall. I wonder if anybody is going to have anything to say about the color of the brick not matching? The darker brick was placed on site. It appears that the lighter brick is not brick but stained concrete (I have not been able to get close enough to see.)

    garage-mckinley-angelle


  20. #260
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    3,030

    Default Re: Campus Construction

    Energy efficiency project is under construction. There will be new cooling towers at the Student Union and Doucet Hall with improvements to the chilled water loop at the student union. One of the new cooling towers is to the left rear.

    energy-efficiency

    Welders work station. Must get pretty hot in the afternoon. Note asbestos laden Evangeline Hall to the rear and the roof vents that were replicated on new Baker Hall.

    welders-work-space

    The flying cantilever is the only example of anything of value on the soon to be demolished Guillory Hall. These buildings were built in 1955 and are the worst eyesore on campus.

    flying-cantilever


Page 13 of 39 FirstFirst ... 3 9 10 11 12 13 14 15 16 17 23 ... LastLast

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •