  1. #201
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    2,845

    Default Re: Campus Construction

    Demolition of Huger, Baker, Bonin and Evageline should start soon.

    Huger-baker-bonin

    The stump to the right was an Oak tree that was over 50 years old. Funny how they take these trees down when school is out. This is one they said they were going to move.

    baker-bonin-evangeline

    Oak tree removed from behind Bonin Hall
    bonin-tree

    Plaque at entrance to old Huger hall (I hope nobody steals it)

    huger-plaque

    Plaque at entrance to old Baker hall (I hope nobody steals this one too)baker-plaque


  2. #202
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    2,845

    Default Re: Campus Construction

    New Baker hall as of 5-21-11 Brick work up to the third floor level at this side of the building

    new-baker-4-21

    New Baker as seen from Taft Street

    new-baker-1

    Brick layer foreman to the left. they were setting precast concrete sections on the wall. Note the two story poles attached by "C" clamps on the walls. Story poles are used to make sure you end where you started.

    brick-foreman


  3. #203
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    2,845

    Default Re: Campus Construction

    Parking Garage as of 5-21-11

    parking-garage-5-21

    One of the Mc Kinley street entrances. I was hoping they would have an arch somewhere on this building as there is an arch on almost all of the buildings on campus.

    parking-garage-mc-kinley

    Parking garage as seen from the front of Hamilton Hall

    parking-garage-hamilton


  4. #204
    Join Date
    May 2011
    Posts
    617

    Default Re: Campus Construction

    Facilities will be much better, but wish we had much more land for the more landscaping.

    I sometimes took classes in what was then called "little abbeville," the wooden buildings built during WWII at the back of campus.

    The campus was more beautiful then, but it got pretty hot in those old buildings.


  5. #205
    Boomer's Avatar
    Boomer is offline Ragin Cajuns of Louisiana Ragin' Cajuns Greatest Fan Ever
    Join Date
    Jun 2002
    Posts
    18,730

    Default Re: Campus Construction

    Quote Originally Posted by USL1970 View Post
    _ Facilities will be much better, but wish we had much more land for the more landscaping.

    I sometimes took classes in what was then called "little abbeville," the wooden buildings built during WWII at the back of campus.

    The campus was more beautiful then, but it got pretty hot in those old buildings. _
    Just wait---T-Joe's landscaping is on the way!!!!! I wish we had the fore and after of the entire campus since he came!!!!!

  6. #206
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    2,845

    Default Re: Campus Construction

    I do know that the Campus is much cleaner now. they have had prison labor on campus on Saturdays to help with the clean up. Not long after Dr. Savoie became president they did a general clean up of the buildings on campus. That was about the same time they cleaned Cajun Field. It looks much better now.

    I would like to see what the landscaping will look like around the parking garage and New Baker and the Tulane Ave dorm (probably new Huger).


  7. #207
    Boomer's Avatar
    Boomer is offline Ragin Cajuns of Louisiana Ragin' Cajuns Greatest Fan Ever
    Join Date
    Jun 2002
    Posts
    18,730

    Default Re: Campus Construction

    Quote Originally Posted by HelmutVII View Post
    _ I do know that the Campus is much cleaner now. they have had prison labor on campus on Saturdays to help with the clean up. Not long after Dr. Savoie became president they did a general clean up of the buildings on campus. That was about the same time they cleaned Cajun Field. It looks much better now.

    I would like to see what the landscaping will look like around the parking garage and New Baker and the Tulane Ave dorm (probably new Huger). _
    I think--again

    I think that in the visual that the university released--it showed some really nice seating areas with the trees and just nicely done L-scaping---With all this done so well --just know that the rest will be very much in line with the total construction package!!!!


  8. #208
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    2,845

    Default Re: Campus Construction

    Baker Hall Saturday May 28, 2011. the dark colored brick on the left has been cleaned the rest has not.

    baker1

    View of Baker Hall from Taft Street

    baker2

    The building is basically out of the weather. Still plenty of brick work to do on the back side of the building


  9. #209
    Boomer's Avatar
    Boomer is offline Ragin Cajuns of Louisiana Ragin' Cajuns Greatest Fan Ever
    Join Date
    Jun 2002
    Posts
    18,730

    Default Re: Campus Construction

    Quote Originally Posted by HelmutVII View Post
    _ Baker Hall Saturday May 28, 2011. the dark colored brick on the left has been cleaned the rest has not.

    baker1

    View of Baker Hall from Taft Street

    baker2

    The building is basically out of the weather. Still plenty of brick work to do on the back side of the building _
    Get these guys to do Moore Field!!!!

  10. #210
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    2,845

    Default Re: Campus Construction

    Parking Garage as of May 28, 2011.

    garage1

    Two entrances on McKinley street

    this one near Angelle Hall

    garage2

    this one near Hamilton Hall

    garage3

    they should be pretty close to being through with the McKinley side of the garage by the end of next week. If that happens, they will be about 50% finished with the erection of the building.

    This is a view from the front yard of Hamilton Hall

    garage4

    They have placed temprary fencing around old Baker and Huger along with Bonin, Evangeline and Buchanan Halls. Looks like demolition should start pretty soon on Bonin, old Baker and Huger and Evageline. (Maybe next week)


  11. #211
    Boomer's Avatar
    Boomer is offline Ragin Cajuns of Louisiana Ragin' Cajuns Greatest Fan Ever
    Join Date
    Jun 2002
    Posts
    18,730

    Default Re: Campus Construction

    Quote Originally Posted by HelmutVII View Post
    _ Parking Garage as of May 28, 2011.

    garage1

    Two entrances on McKinley street

    this one near Angelle Hall
    First I hear that we have offered a recruit in baseball to start next year---had no idea that we named a building after our freshman pitcher that got hurt!!!!!! Is it true that the facade will be decorated with lensless eyeglasses!!!! LOL
    garage2

    this one near Hamilton Hall

    garage3

    they should be pretty close to being through with the McKinley side of the garage by the end of next week. If that happens, they will be about 50% finished with the erection of the building.

    This is a view from the front yard of Hamilton Hall

    garage4

    They have placed temprary fencing around old Baker and Huger along with Bonin, Evangeline and Buchanan Halls. Looks like demolition should start pretty soon on Bonin, old Baker and Huger and Evageline. (Maybe next week) _

  12. #212
    Join Date
    Jan 2002
    Location
    Louisiana A
    Posts
    18,291
    Blog Entries
    2

    Default Re: Campus Construction

    Thanks for all the updates, a virtual archived history of the projects.


  13. #213
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    2,845

    Default Re: Campus Construction

    Turbine, will last weekends post be recovered?


  14. #214
    Join Date
    Jan 2002
    Location
    Louisiana A
    Posts
    18,291
    Blog Entries
    2

    Default Re: Campus Construction

    Quote Originally Posted by HelmutVII View Post
    _ Turbine, will last weekends post be recovered? _
    I'm sorry, I can't recover posts from June 1-5

    Do you still have access to the pictures you posted?

  15. #215
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    2,845

    Default Re: Campus Construction

    I kind of wanted to keep an archive of the construction on a weekly basis so i will repost. This is work on campus ending the week of June 4, 2011


    Demolition of Bonin, Baker, Huger and Evangeline continues. this is a debris pile behind Bonin.

    bonin-debris


    An asbestos condom on Evangeline Hall. They use this to see that there is positive air pressure in the building while removing asbestos

    asbestos-condom


  16. #216
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    2,845

    Default Re: Campus Construction

    New Baker hall on June 4, 2011

    Baker-june-4

    Flared soldier course over windows with a keystone. A common detail on many buildings on campus. With more brick work being completed on Baker they are incorporating arches at various locations on the buildings. There are arches on most of the older buildings on campus.

    baker-soldier-course

    A view of Baker Hall from Tulane Ave. The second dorm (probably Huger) is in the foreground.

    Baker-tulane

    An old fallout shelter sign on Angelle Hall. It could hold 160 people. I don't think they know it's still there.

    old-sign


  17. #217
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    2,845

    Default Re: Campus Construction

    Parking Garage as of June 4, 2011

    garage-june-4

    McKinley street face of parking garage.

    garage-mckinley

    Parking Garage view from Hamilton Hall front Yard.

    garage-hamilton

    Placing a prefabricated concrete panel for a roof section over one of the stairwells

    garage-roof-section


  18. #218
    Join Date
    Nov 2006
    Location
    Lafayette, Louisiana
    Posts
    650

    Default Re: Campus Construction

    Were you taking pictures Saturday around 4ish?


  19. #219
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    2,845

    Default Re: Campus Construction

    Quote Originally Posted by Cajunbander View Post
    _ Were you taking pictures Saturday around 4ish? _
    I guess it might have been about 3 or 4.

  20. #220
    BeauCajun's Avatar
    BeauCajun is offline Ragin Cajuns of Louisiana Ragin' Cajuns Greatest Fan Ever
    Join Date
    May 2002
    Location
    Erath, La.
    Posts
    6,161

    Default Re: Campus Construction

    Does anyone know what the plans are for the area that these dorms occupy once demo is complete?


Page 11 of 37 FirstFirst ... 7 8 9 10 11 12 13 14 15 21 ... LastLast

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •