Thread: Campus Construction

  1. #181
    Join Date
    Jan 2011
    Posts
    191

    Default Re: Campus Construction

    Quote Originally Posted by Boomer View Post
    _ Yea but who "SCREWED UP" the Lamson Project????? _
    I don't know. Probably some tool.

  2. #182
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    3,030

    Default Re: Campus Construction

    Another week of good progress. they have continued to erect scafolding for brick work and they have their first load of bricks delivered.
    april30-2011


    North end of Baker Dorm
    baker-north


    South end of Baker dorm
    baker-south


    Baker dorm from Tulane Ave.
    baker-tulane


    Tulane Ave dorm stair wells and elevator shafts under construction.
    tulane-dorm


  3. #183
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    3,030

    Default Re: Campus Construction

    Parking Garage as of April 30, 2011 another good week of progress.
    Parking-garage-4-30


    East side ramps taking shape
    east-ramps


    Parking Garage from Tulane Ave
    garage-tulane

    Parking Garage Close up
    garage-close-up

    Another close up
    garage-close-up-2PICT0114


    New Credit Union offices.
    credit-union


  4. #184
    Join Date
    Sep 2008
    Posts
    238

    Default Re: Campus Construction

    thanks helmut,
    i was curious where the tilt panels at cajun field had disappeared to.


  5. #185
    Join Date
    Nov 2006
    Location
    Lafayette, Louisiana
    Posts
    650

    Default Re: Campus Construction

    I went and took some pictures today of the construction. Its amazing, its like the parking tower is a big, real life Lego set. They lift a section, put it in place, attach it, then move on to the next one, everything has a specific place and locks in to the other pieces. Being a fan of Legos when I was a kid, it's really cool to watch.




    Some more pictures I took today of the construction:
    http://www.facebook.com/media/set/?s...57521.47907792


  6. #186
    Join Date
    Apr 2006
    Location
    Lafayette, LA
    Posts
    4,223

    Default Re: Campus Construction

    this parking garage design looks better than the taft st one, any info on that helmet?


  7. #187
    Join Date
    Nov 2006
    Location
    Lafayette, Louisiana
    Posts
    650

    Default Re: Campus Construction

    Quote Originally Posted by ulforlife View Post
    _ this parking garage design looks better than the taft st one, any info on that helmet? _
    It looks like the new one's going to be bigger, taller, and like the parking tower downtown. What I mean, is that it looks like the floors will be level and there will be up and down ramps, instead of the parking space itself being slanted to get up and down like the one there already.

  8. #188
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    3,030

    Default Re: Campus Construction

    Tulane Avenue dorm slab as of 5/08/11 if they are consistent, this Dorm will be named Huger. Looks like they will place concrete after the stairwells are finished
    Tulane-slab

    Tulane Ave dorm stairwell
    tulane-stariwell


  9. #189
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    3,030

    Default Re: Campus Construction

    Baker Dorm as of 5/08/11. Looks like they have the first few courses of brick around a good part of the building and will start brick work in earnest this week.
    Baker-5-08

    North end of Baker Dorm
    Baker-North

    South end of Baker Dorm
    Baker-South

    View of Baker dorm from Tulane Ave.
    Baker-Tulane

    Story pole used by brick layers to assure a level brick course around the building and that headers over windows and doors are at the same level. Brick layers don't like you messing with this.
    Baker-story-pole


  10. #190
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    3,030

    Default Re: Campus Construction

    Parking Garage as of 5/08/11. This will be a very imposing building. some may not like it because it will be out of proportion to other buildings on campus.
    Garage-5-08

    East ramp structure taking shape.
    Garage-East-ramp

    View of parking garage from Tulane Ave.
    garage-tulane

    West ramp of parking garage
    Garage-west-ramp

    Korbels sticking out to support ramps for the parking garage. The ramps will be on the interior of the building with the exterior floors level. You will see each floor as level from the outside.
    Garage-Korbels

    Counterweights on the crane used to lift precast concrete sections.
    Garage-counter-weights


  11. #191
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    3,030

    Default Re: Campus Construction

    January 2, 2011
    demo-1

    May 8, 2011
    Baker-5-08


    January 2, 2011

    demo3

    May 8, 2011
    Garage-5-08


  12. #192
    Join Date
    Jan 2002
    Location
    Louisiana A
    Posts
    19,896
    Blog Entries
    2

    Default Re: Campus Construction

    Wow

    Thanks


  13. #193
    Join Date
    Nov 2006
    Location
    Lafayette, Louisiana
    Posts
    650

    Default Re: Campus Construction

    Quote Originally Posted by HelmutVII View Post
    _ Parking Garage as of 5/08/11. This will be a very imposing building. some may not like it because it will be out of proportion to other buildings on campus.


    View of parking garage from Tulane Ave.
    garage-tulane
    You are not kidding. It's already kind of imposing in this picture.

  14. #194
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    3,030

    Default Re: Campus Construction

    Consistent progress through the week. Brick work has started in earnest this week and has progressed above the bottom of the second floor windows. More interior work being done.
    baker-5-14


    Close up of the brick work

    baker-brick


    Tulane avenue dorm as of 5-14. Just placed concrete this morning.

    tulane-dorm5-14


  15. #195
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    3,030

    Default Re: Campus Construction

    Parking Garage as of 5-14

    Garage-5-14

    Parking Garage from McKinley

    garage-mc-kinley

    Parking garage from Tulane Avenue
    garage-tulane-2

    The parking garage will be a huge structure.


  16. #196
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    3,030

    Default Re: Campus Construction

    Today I noticed that they are in the process of removing all the Air Conditioner units and some furniture from old Baker and Huger halls. I guess they are pretty confident that the new Baker Hall will be finished for the Fall semester.


  17. #197
    Join Date
    Jun 2006
    Location
    Lafayette, LA
    Posts
    582

    Default Re: Campus Construction

    Quote Originally Posted by HelmutVII View Post
    _ Today I noticed that they are in the process of removing all the Air Conditioner units and some furniture from old Baker and Huger halls. I guess they are pretty confident that the new Baker Hall will be finished for the Fall semester. _
    Big boss says August. Just need a few more weeks of good weather and it will be about all inside for this one. One big dorm. And more coming. Parking garage will help a great deal - depending on cost!! Impressed with construction crew. Getting after it. Seems well coordinated.

  18. #198
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    3,030

    Default Re: Campus Construction

    Demolition of Huger, Baker, Bonin and Evageline should start soon.

    Huger-baker-bonin

    The stump to the right was an Oak tree that was over 50 years old. Funny how they take these trees down when school is out. This is one they said they were going to move.

    baker-bonin-evangeline

    Oak tree removed from behind Bonin Hall
    bonin-tree

    Plaque at entrance to old Huger hall (I hope nobody steals it)

    huger-plaque

    Plaque at entrance to old Baker hall (I hope nobody steals this one too)baker-plaque


  19. #199
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    3,030

    Default Re: Campus Construction

    New Baker hall as of 5-21-11 Brick work up to the third floor level at this side of the building

    new-baker-4-21

    New Baker as seen from Taft Street

    new-baker-1

    Brick layer foreman to the left. they were setting precast concrete sections on the wall. Note the two story poles attached by "C" clamps on the walls. Story poles are used to make sure you end where you started.

    brick-foreman


  20. #200
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    3,030

    Default Re: Campus Construction

    Parking Garage as of 5-21-11

    parking-garage-5-21

    One of the Mc Kinley street entrances. I was hoping they would have an arch somewhere on this building as there is an arch on almost all of the buildings on campus.

    parking-garage-mc-kinley

    Parking garage as seen from the front of Hamilton Hall

    parking-garage-hamilton


Page 10 of 39 FirstFirst ... 6 7 8 9 10 11 12 13 14 20 ... LastLast

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •