    Quote Originally Posted by Frenchie35 View Post
    So we will have a building within a building. Would love to have someone tell me where they have ever seen construction like this. After they build the new clubhouse will the old clubhouse remain as some relic of the past inside the bowels of the stadium? I guess what I am saying, why hold on to this building at all. The coaches and players are in the Cox building now. Maybe, and just maybe the ones in charge will construct a new building knowing that the Cox has to come down. I will be going down there today to see the footprint of the new construction along the third base side. And maybe, if I can find someone to give me answers about that section and how it will look. I am not pushing for some explanation, just curious......Might see Rob. He will know.
    Ever seen a concession stand under a stadium/ bleachers? It will look like that




    Hopefully this allows the cox building to be blown up sooner than later
    Attached Images Attached Images  

  2. #102
    CajunAmos's Avatar
    CajunAmos is offline Ragin Cajuns of Louisiana Ragin' Cajuns Greatest Fan Ever
    Join Date
    Jan 2003
    Location
    Lafayette
    Posts
    5,577

    Default Re: Construction Cam is Up!!!!!!!!

    Quote Originally Posted by facelessjonmoon View Post
    Ever seen a concession stand under a stadium/ bleachers? It will look like that


    Hopefully this allows the cox building to be blown up sooner than later
    And maybe can be converted to concessions and/or restrooms or maybe a visitors dressing room which would move us up a notch I would think.

  3. #103
    Join Date
    Jun 2016
    Posts
    263

    Default

    Quote Originally Posted by CajunAmos View Post
    And maybe can be converted to concessions and/or restrooms or maybe a visitors dressing room which would move us up a notch I would think.
    Yep, this space can be repurposed many different ways once the new clubhouse is built

    It won't be just sitting there as a relic

  4. #104
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    2,814

    Default Re: Construction Cam is Up!!!!!!!!

    Quote Originally Posted by Frenchie35 View Post
    So we will have a building within a building. Would love to have someone tell me where they have ever seen construction like this. After they build the new clubhouse will the old clubhouse remain as some relic of the past inside the bowels of the stadium? I guess what I am saying, why hold on to this building at all. The coaches and players are in the Cox building now. Maybe, and just maybe the ones in charge will construct a new building knowing that the Cox has to come down. I will be going down there today to see the footprint of the new construction along the third base side. And maybe, if I can find someone to give me answers about that section and how it will look. I am not pushing for some explanation, just curious......Might see Rob. He will know.

    The building inside the building becomes a room. All you have to do is walk over to cajun field and see the concession area as a building in a building. Or go to the Cajun dome and you will see the ticket offices as a separate building use in the structure. This is even more obvious now in that the dome is being totally renovated and when you go to the ticket office you don't see any evidence that the dome is being worked on.

    Go to any high school football stadium and you will see rest rooms built under the stands. You could demolish the stands and have rest rooms or demolish the rest rooms and still have the stands.

    Technically what we will have at Tigue Moore is what is called a "mixed use" structure. Nothing really unusual about it.

  5. #105
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    2,814

    Default Re: Construction Cam is Up!!!!!!!!

    Busting rebar and setting forms today. Should be placing concrete for foundation very soon.


  6. #106
    BeauCajun's Avatar
    BeauCajun is offline Ragin Cajuns of Louisiana Ragin' Cajuns Greatest Fan Ever
    Join Date
    May 2002
    Location
    Erath, La.
    Posts
    6,039

    Default Re: Construction Cam is Up!!!!!!!!

    Quote Originally Posted by HelmutVII View Post
    Busting rebar and setting forms today. Should be placing concrete for foundation very soon.
    Precast concrete walls are going up at Southside High. Most of the Lemoine subs should be heading to the Tigue.

  7. #107
    wcd35's Avatar
    wcd35 is offline Ragin Cajuns of Louisiana Ragin' Cajuns Greatest Fan Ever
    Join Date
    Mar 2006
    Location
    Lafayette
    Posts
    8,014

    Default Re: Construction Cam is Up!!!!!!!!

    Someone moved the Construction Cam. Much better view now


  8. #108
    CajunEXPRESS's Avatar
    CajunEXPRESS is online now Ragin Cajuns of Louisiana Ragin' Cajuns Greatest Fan Ever
    Join Date
    Jan 2011
    Posts
    12,785

    UL Baseball Re: Construction Cam is Up!!!!!!!!

    Yes, more symmetrical, I noticed that this morning when I checked things out.


  9. #109
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    2,814

    Default Re: Construction Cam is Up!!!!!!!!

    Quote Originally Posted by BeauCajun View Post
    Precast concrete walls are going up at Southside High. Most of the Lemoine subs should be heading to the Tigue.
    Could be differnt subs. Are doing precast panels or tilt up at the school?

  10. #110
    CajunAmos's Avatar
    CajunAmos is offline Ragin Cajuns of Louisiana Ragin' Cajuns Greatest Fan Ever
    Join Date
    Jan 2003
    Location
    Lafayette
    Posts
    5,577

    Default Re: Construction Cam is Up!!!!!!!!

    Quote Originally Posted by HelmutVII View Post
    Could be differnt subs. Are doing precast panels or tilt up at the school?
    Looking at the forms they are placing it seems to encompass a large area with plumbing/electrical risers but seems to have a large amounts of loose dirt. Is this going to be covered over or is there additional work needed before the pour can happen? Or is the loose dirt in the view not in the area of the pour?

  11. #111
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    2,814

    Default Re: Construction Cam is Up!!!!!!!!

    Quote Originally Posted by CajunAmos View Post
    Looking at the forms they are placing it seems to encompass a large area with plumbing/electrical risers but seems to have a large amounts of loose dirt. Is this going to be covered over or is there additional work needed before the pour can happen? Or is the loose dirt in the view not in the area of the pour?
    They are forming up and placing rebar for footings. Once the concrete for the footings is placed then I suspect they will come back and place a slab over the areas between the footings. The footing is what the building is place upon while the slab is basically a floor. This is very common construction technique in commercial construction.

    I would hope that they would move the camera a little further away because, once they start erection the structure the only thing we will see is the wall that is going to be atop the footing immediately in front of the camera.

  12. #112
    CajunAmos's Avatar
    CajunAmos is offline Ragin Cajuns of Louisiana Ragin' Cajuns Greatest Fan Ever
    Join Date
    Jan 2003
    Location
    Lafayette
    Posts
    5,577

    Default Re: Construction Cam is Up!!!!!!!!

    Quote Originally Posted by HelmutVII View Post
    They are forming up and placing rebar for footings. Once the concrete for the footings is placed then I suspect they will come back and place a slab over the areas between the footings. The footing is what the building is place upon while the slab is basically a floor. This is very common construction technique in commercial construction.

    I would hope that they would move the camera a little further away because, once they start erection the structure the only thing we will see is the wall that is going to be atop the footing immediately in front of the camera.
    So all the current forming is for footings? I just thought all the non-packed dirt looked odd in between all the areas awaiting a concrete pour. I'm also curious about how deep the footings might be for a structure of this size. From the view it looks like about 3'.

  13. #113
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    2,814

    Default Re: Construction Cam is Up!!!!!!!!

    Quote Originally Posted by CajunAmos View Post
    So all the current forming is for footings? I just thought all the non-packed dirt looked odd in between all the areas awaiting a concrete pour. I'm also curious about how deep the footings might be for a structure of this size. From the view it looks like about 3'.
    The footings connect pile caps and are used to transfer loads to the deep foundation. I THINK they placed auger cast piles that were about 40 or 50 feet deep.

  14. #114
    Boomer's Avatar
    Boomer is offline Ragin Cajuns of Louisiana Ragin' Cajuns Greatest Fan Ever
    Join Date
    Jun 2002
    Posts
    18,602

    Default Re: Construction Cam is Up!!!!!!!!

    Quote Originally Posted by HelmutVII View Post
    The footings connect pile caps and are used to transfer loads to the deep foundation. I THINK they placed auger cast piles that were about 40 or 50 feet deep.
    ---Helmut---probably the guy with the least knowledge of this asks---Does the mid stadium seem smaller than thought to be at this time???

  15. #115
    Join Date
    Feb 2005
    Location
    Lafayette
    Posts
    476

    Default

    I have actually been impressed with the amount of workers lately and how much progress theyve made the past two weeks.


  16. #116
    Frenchie35's Avatar
    Frenchie35 is offline Ragin Cajuns of Louisiana Ragin' Cajuns Greatest Fan Ever
    Join Date
    May 2008
    Posts
    5,791

    Default Re: Construction Cam is Up!!!!!!!!

    Quote Originally Posted by HelmutVII View Post
    They are forming up and placing rebar for footings. Once the concrete for the footings is placed then I suspect they will come back and place a slab over the areas between the footings. The footing is what the building is place upon while the slab is basically a floor. This is very common construction technique in commercial construction.

    I would hope that they would move the camera a little further away because, once they start erection the structure the only thing we will see is the wall that is going to be atop the footing immediately in front of the camera.
    The camera could have been placed on one of the outfield lights and have a pan right to left and focus in and out like they had for the APC.....

  17. #117
    CajunAmos's Avatar
    CajunAmos is offline Ragin Cajuns of Louisiana Ragin' Cajuns Greatest Fan Ever
    Join Date
    Jan 2003
    Location
    Lafayette
    Posts
    5,577

    Default Re: Construction Cam is Up!!!!!!!!

    Quote Originally Posted by HelmutVII View Post
    The footings connect pile caps and are used to transfer loads to the deep foundation. I THINK they placed auger cast piles that were about 40 or 50 feet deep.
    So piles would have been driven earlier and the existing concrete pour will secure the new footings to the existing piles? Would this have been from the original stadium as I haven't seen any machines in any of the photos recently to indicate this was done once the old stadium structure was removed?

  18. #118
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    2,814

    Default Re: Construction Cam is Up!!!!!!!!

    Quote Originally Posted by CajunAmos View Post
    So piles would have been driven earlier and the existing concrete pour will secure the new footings to the existing piles? Would this have been from the original stadium as I haven't seen any machines in any of the photos recently to indicate this was done once the old stadium structure was removed?

    I saw some spiral tied rebar cages that were about 40 feet long stored on site. That is typically reinforcing for a drilled concrete shaft. I am assuming that is what they were for. I have no inside information on this though.

  19. #119
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    2,814

    Default Re: Construction Cam is Up!!!!!!!!

    Quote Originally Posted by Boomer View Post
    ---Helmut---probably the guy with the least knowledge of this asks---Does the mid stadium seem smaller than thought to be at this time???
    The lens on the camera is a wide angle lens. What we are seeing is distorted.

  20. #120
    Join Date
    Sep 2011
    Location
    Houston, TX
    Posts
    356

    Default Re: Construction Cam is Up!!!!!!!!




    Please don't kill him. He knows not what he says

Page 6 of 120 FirstFirst ... 2 3 4 5 6 7 8 9 10 16 ... LastLast

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •