Thread: Student Union Construction.

  1. #41
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    1,019

    Default Re: Student Union Construction.

    I found out yesterday that the renovation project is indeed out for bid. It usually is a 30 day process. That means bids should be due in late July. If the bids come in within the budget it should take about 45 to 60 days for the paper work to get processed. I'm thinking they should get started with construction in late September or early October.


  2. #42
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    1,019

    Default Re: Student Union Construction.

    Some minor work going on to get Guillory, (old) Corona and Olivier halls ready for occupancy during the renovation.

    Improvements to Olivier Hall (it hurt to take this photo)

    Olivier

    A shed to cover entrance to the temporary food storage freezers and coolers. Looks kind of flimsy to me I hope we don't have a Hurricane while this is in use because it's gone if we do.

    shed

    Cypress Lake facade of existing Student Union.

    cypress-lake-facade


  3. #43
    Join Date
    Apr 2002
    Location
    Louisiana A
    Posts
    9,280
    Blog Entries
    1

    Default Re: Student Union Construction.

    Quote Originally Posted by HelmutVII View Post
    Some minor work going on to get Guillory, (old) Corona and Olivier halls ready for occupancy during the renovation.

    Improvements to Olivier Hall (it hurt to take this photo)

    Olivier
    For some reason I thought they were going to open the view to the swamp. Unless I am thinking of the wrong building it will still be blocked. ?

    University of Louisiana Ragin' Cajuns the #1 Sports Choice in Acadiana.


  4. #44
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    1,019

    Default Re: Student Union Construction.

    Quote Originally Posted by Turbine View Post
    For some reason I thought they were going to open the view to the swamp. Unless I am thinking of the wrong building it will still be blocked. ?
    This building will be demolished AFTER the renovation is completed. Some of the offices in the current union will move here during the renovation.

  5. #45
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    1,019

    Default Re: Student Union Construction.


  6. #46
    Join Date
    Oct 2011
    Location
    Lafayette, LA
    Posts
    650

    Default Re: Student Union Construction.

    This is my last semester at UL. I almost don't want to graduate now...almost.


  7. #47
    Join Date
    Jan 2003
    Location
    Lafayette
    Posts
    2,323

    Default Re: Campus Construction

    Boy, the roof of the student union looks bad.


  8. #48
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    1,019

    Default Re: Student Union Construction.

    Looks like I found two good spots to document Student Union Construction.

    The north Harris Hall fire escape. McLaurin Gym is behind the trees to the left, Student Union is to the rear and you can just see the wall of Bonin Hall to the right.

    union-spot

    and the top of Olivier Parking Tower

    union-spot-2

    I should be able to access both places throughout the entire construction process. The view from the fire escape will be of the new food service wing. This is where the old Saucier clinic was.

    Looks like the band practice field is ready for foot steps next week.

    band-practice


  9. #49
    Join Date
    Oct 2003
    Posts
    2,372

    Default Re: Student Union Construction.

    Quote Originally Posted by HelmutVII View Post
    Looks like I found two good spots to document Student Union Construction.

    The north Harris Hall fire escape. McLaurin Gym is behind the trees to the left, Student Union is to the rear and you can just see the wall of Bonin Hall to the right.

    union-spot

    and the top of Olivier Parking Tower

    union-spot-2

    I should be able to access both places throughout the entire construction process. The view from the fire escape will be of the new food service wing. This is where the old Saucier clinic was.

    Looks like the band practice field is ready for foot steps next week.

    band-practice
    Man it's gonna get loud in there lol.

  10. #50
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    1,019

    Default Re: Student Union Construction.

    Student Union Construction has not started in earnest yet. It looks like they are getting logistics worked out for food service. Food service will be moving to Guillory Hall (the building with the catwalk over Cypress Lake). Other Union services are moving into the eyesores across from campus police.

    This area is going to be the new food service wing for the Student Union. This is where the old Saucier clinic used to be. Photo taken from the front of Buchanan Hall

    stu-union-1


    Food service hours for Guillory Hall

    guillory-hall-hours


    DON'T FREAK OUT!!!! It's not permanent and this building will be demolished after renovation is complete. This is old Corona Hall and is where the cashiers are located.

    don'r-freak

    Cleaned up area around cypress lake by eyesore buildings. The ratty looking fence is to keep the gators in the lake. I hope they did a good job of fixing it. I'm not looking forward to a gator getting out AGAIN!!!

    cleaned-up

    The above area was so overgrown for so long I bet many of you did not know this was there. I knew it and every time I passed by I wished they would clean up around it so people could see it. I'm glad they finally did.

    monument

    I'm sure this area was fairly nice when it was new but the lack of upkeep really makes it look bad. I do hope they can keep Guillory Hall and renovate it. EVERY TIME I go on campus there is somebody there feeding the fish and turtles hoping to get a chance to see a gator.


  11. #51
    Join Date
    Jan 2003
    Location
    Lafayette
    Posts
    2,323

    Default Re: Student Union Construction.

    I spent many a time in Gullory Hall knocking down pins. I even worked there part time while in school for a while. For those who don't remember, the University had a pretty competitive bowling team back in the day.


  12. #52
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    1,019

    Default Re: Student Union Construction.

    Quote Originally Posted by CajunAmos View Post
    I spent many a time in Gullory Hall knocking down pins. I even worked there part time while in school for a while. For those who don't remember, the University had a pretty competitive bowling team back in the day.
    I took a Bowling class there for PE. I made a spare on a 7 10 split. It came that close to being a gutter ball.

  13. #53
    Boomer's Avatar
    Boomer is offline Ragin Cajuns of Louisiana Ragin' Cajuns Greatest Fan Ever
    Join Date
    Jun 2002
    Posts
    8,131

    Default Re: Student Union Construction.

    It WAS the old student Union or STU----When you walked in you could see the groups---Each frat had their area --the FB team and some jocks---the commuters---some sorority areas----Pep rallies were held in there and I had my first frito pie!!!


  14. #54
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    1,019

    Default Re: Student Union Construction.

    things are starting move along on the Student Union Project.

    A view of the soon to be demolished middle section of the Union.

    dec-2-1

    A view from the Harris Hall fire escape. this is where they will be adding on to the building.


    dec-2-3


    D H Griffin equipment on site to start demo work. This is the same company that demolished to old dorms.

    dec-2-2


  15. #55
    Join Date
    Nov 2012
    Posts
    285

    Default Re: Student Union Construction.

    Wait I paid for this and I'll never get to use it ... (sarcasm off) Awesome can't wait to see the finished product.


  16. #56
    Join Date
    Oct 2006
    Location
    Lafayette
    Posts
    2,176

    Default Re: Student Union Construction.

    Quote Originally Posted by NO BOWL 11 Grad View Post
    Wait I paid for this and I'll never get to use it ... (sarcasm off) Awesome can't wait to see the finished product.
    Sounds like social security.

  17. #57
    Join Date
    Oct 2011
    Location
    Lafayette, Louisiana
    Posts
    1,031

    Default Re: Student Union Construction.

    How long do you expect them to fence off the student union like that? I'm assuming a while huh? It's getting really annoying walking around that part of campus now.



  18. #58
    Join Date
    Nov 2012
    Posts
    285

    Default Re: Student Union Construction.

    Yea I remember having to gravel it up to get to the union while they were doing the renovations to Burke Hawthorne... especially sucked on rainy days... probably a long while


  19. #59
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    1,019

    Default Re: Student Union Construction.

    Quote Originally Posted by I_Bleed_RED View Post
    How long do you expect them to fence off the student union like that? I'm assuming a while huh? It's getting really annoying walking around that part of campus now.
    I suspect it will be a good while before all the fencing is down. The fencing on Boucher Street should be moved after the drainage project is finished though. I did notice that they fenced around Buchanan Hall so they may have found some money to finish the renovation of that building with the Student Union project.

    I do hope that they can do something to keep Guillory Hall. Every time I walk on campus there are always people feeding the fish from the balcony. Mostly families with kids.

  20. #60
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    1,019

    Default Re: Student Union Construction.

    Demolition of the middle section of the Student Union building has started.

    This is what is left of the entrance to the Bookstore.

    dec-9-1

    Same part of the building as seen from the top of Olivier Parking tower. They will not demolish the section to the right but will demolish the section to the left.

    dec-9-3

    Opening up the area between the Ball room(left) and the old kitchen (Right). They will not demolish the Ball Room but the kitchen will soon be history.

    dec-9-2


    Another view of the same area from the top of Olivier Parking tower.

    dec-9-4

    Cypress Lake Gator catching some rays before it turns cold again.

    dec-9-5


Page 3 of 8 FirstFirst 1 2 3 4 5 6 ... LastLast

Bookmarks

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •